profile-img

Rahul Anand

Electrical Engineer at HBK Engineering Services WLL

Al Khawr, Qatar

Work Experience

  • Electrical EngineerFull Time

    HBK Engineering Services WLL

    Mar 2019 - Present -6 yrs, 4 months

    • Job Details:Project Details: Lusail Stadium & Precinct (Iconic Stadium for FIFA world Cup) Client: Supreme Committee for Delivery & Legacy Project Management Consultant: Time-Qatar Design Consultant: Aurecon Construction Supervision Consultant: Louis Berger (WSP) Project Cost: 800Million QAR(MEP) Role:  Project Management & Coordination.  Reviewing IFC Drawing, Shop Drawing & Materials Specification.  Preparing Method of Statements, Procedures and Getting Approval from Client/Consultant.  Quantity Surveying From the approved Drawings and Preparing Site BOQ.  Requesting Material from Site and Coordinate with Purchase Department to Deliver the Material on Time.  Check IFC Drawings with the Tender Documents.  Compare Discrepancies in Drawings and BOQ and brings to the Notice of Quantity Surveyor.  Raises queries to the consultants for non-clarity of work in the Drawings.  Creates maintains & Updates Format such as material Tracking Schedule, Drawings Status Schedule MAS Schedule RFI Schedule.  Ensures that all the works are done in accordance with the approved Construction Drawings Contract Documents, Project Specifications and all applicable standard.  Assign Targets for accomplishments and ensure Targets are meet on Daily Basis for all Electrical Group at Site.  Quality Monitoring During execution.  Updating the Project Schedule Status to the Management.  Evaluating Proposals submitted by Subcontractors, making a Cost Comparison Documents and Recommending award of Contract accordingly.  Interfacing with Subcontractors for Work Plan/Progress/Material Planning.  Preparation of Bill of Material & daily, Weekly, Monthly Progress Report. Installation, Testing & Commissioning Overview of Following Electrical MV/LV/ELV System. • Small Power & Lighting System (Conduit, wiring Light Fixtures, Switches, Sockets, Dimmers, Motion Sensors, etc.) • Containment (Cable Tray, Trunking, Wire Mesh, etc.) • Central Battery System • Fire Alarm System • Public Address & Voice Response System • MV System (MV Swithgear, LV Switchgear, SMDB’S, DB’S, Battery Charger, Bus Duct, Transformer) • MV & LV cable Laying Glanding & Termination. • Electrical Grounding & Lightening Protection System. • ICT System  Structural Cabling System (SCS) Implementation & Coordination.  Venue Structural Cabling System.  Venue WIFI System.  Building Data Network System.  Administration Data network system.  Venue Network Security System.  Venue Ticketing System.  Venue Control System.  Tournament Structural Cabling System  Tournament Data System.  Tournament WIFI System, etc.  CCTV, Access Control System (ACS), Master Clock, etc.  Broadcast System Implementation/Coordination.  BMS System Implementation/Coordination.  Induction Loop System Implementation/Coordination  Giant Screen & Ribbon Display Coordination  Hostile Vehicle Mitigation  Exit Gate Release System.  Tournament Score Board System  Venue Timing & Scoring System.  Event Flood Lighting Control System  Vertical Transport System.  Pitch Irrigation System.  Perform other related Duties as may be required by Project Manager.  Review Inspection Test Plans in order to perform all required Inspections.  Review Client Inspection Deliverable, analyze and comply the Punch Points.  Preparing as Built Drawing and Getting Approval from Consultant/Client.  Follow up with Draughtsman and ensure all “As Built Drawings” are submitted immediately Upon Completion of the works.  Responsible for Coordination of Testing & Commissioning activity and Handing over of all Documents and Test Reports to the Consultant for approval.  Ensure Safety Procedures are implemented at Project and creating Safety awareness up to Grass root level Of Organization.
  • Electrical EngineerFull Time

    Voltage Engineering ltd

    Aug 2016 - Feb 2019 -2 yrs, 6 months

    • Job Details:Project Details: 1. Call off Contract for Pilot Cable Fault Modification & Repair. Client: Qatar General Electricity & Water Authority (Distribution Department-ED) Project Cost: 20 Million QAR Contract no: GTC/810/2015 Role:  Analysis of Complete Scope of Work through Contract Document and preparing a procurement Schedule.  Complete Site Survey of Feeders and Locating faults on Low voltage & Pilot Cable.  Pinpointing Fault Location in direct Buried Cable & Pipe arrangements.  Co-ordinate with Client & Concern Authority to obtain necessary approval & Clearance.  Mobilization & Demobilization of Manpower, Machinery & testing Equipment from work site.  Preparation of Bill of Material & daily, Weekly, Monthly Progress Report. 2. EPIC Project of 11KV Distribution System Up gradation in Dukhan Township. Client: Qatar Petroleum, (Oil & Gas) Consultant: Energo Project-Intel Project Cost: 112Million QR Contract no: GC14103300 Role:  Resource Planning based on the project implementation plans for project completion within the targeted project tenure.  Material Take off based on the Drawing and preparing a procurement schedule taking into consideration the project cash flow.  Project Planning, Technical/Material Approvals, Project Tracking & Monitoring, detailed Documentation, Resource management, Team motivation & Team Work, etc.  Prepare RFQ for issuing Subcontracts and recommend the best Fit Subcontractor for the job keeping cost Low.  Review of design & work of Consultant/Subcontractors.  Supervision of Electrical Installation of Electrical System (HV, LVCables, Street Lighting, Substations)  Monitor the Cable laying, Jointing & Termination of 33KV,11KV, LV, Fibre Optic, Pilot Cable, etc  Installation, Testing & Commissioning of Distribution Substation.  Monitor the site Construction/Installations of work of all relevant Engineering disciplines of assigned Construction Contracts and in Compliance the Scope of Work, Approved Engineering Standard & specifications.  Monitoring the Installation of HV Switchgear, LV switchgear, Transformers, Auxiliary Board,110V DC UPS system, Telecom System, HVAC System, Fire & Gas System  Execution of, MEP Work, (Installation of Trunking, Conduit, Wiring, Switch, sockets, Light Fixers, etc) Indoor &Outdoor Earthing, Structural Work (Fixing of Tray & Ladders) as per approved drawing.  Preparation of Site Modifications and obtaining Clearance from Design department.  Review & Finalize List of Material Submittals and coordinating & Obtaining approvals.  Evaluating the Quantity of Material Utilized and confirming with Drawings  Preparation of Method Statement, Red Line Mark Up Drawings.  Ensure and Follow Up Completion and Clearance of all Punch List Items.  Managing all Required Manpower & Machinery at site  Ensure QA/QC procedures to be implemented meticulously.  Orchestrate with staff to ensure all HSE guidelines, rules and regulations are adhered to and risks are avoided within the working Environment. Key Contributions:  Forecast requirement of Electrical Engineering resources and allocate those resource, Electrical Design Integrity of work scope & maintenance of Standard.  Verify and confirm BOQ, Prelims & other expenses in advance to avoid unwanted/Unaccounted Costs.  Reduce Internal Manpower costs by managing resource appropriately.
  • Electrical Engineer/GETFull Time

    Nagarjuna Construction Company Ltd

    Jul 2013 - Jul 2016 -3 yrs

    • Job Details:Project Details: 1.Planning Designing & Construction of Apartment. Client: Lucknow Development Authority U.P Housing Board. Project Cost:3169 Million INR Role:  Review Project Specification & shop Drawing.  Quantities Take Off for the Project.  Ensure timely submission of all Project Submittal & Obtaining Approvals for (Sample, Shop Drawing, Material Submittal, Method Statements, ITP).  Perform all MEP site activity and coordinate with civil & architecture team during execution of MEP services.  Liasoning with different agencies for Design related Issue.  Control Procedures for all activities on Site Prior to Installations and ensure receipt of approved Copies from Authorized Consultant.  Planning & Scheduling of Resources (Material, Manpower, etc)  To Give Full & Extensive Instruction to Site Team.  Follow-up for material / subcontractor’s submittal and approval on time in coordination with main contractors/consultants/clients.  Designed the electrical lighting Layout, Power Layout, Load schedule, Communication Layout as per the client requirement.  Well Versed with the LV & ELV System which includes Small Power &Lighting, Fire Alarm System, CCTV System, Audio Video System, Earthing & Lightening Protection System.  Organize Testing & Commissioning of Installed Items and Supervise Preparation of Test report,Operation & Maintenance Manual.  Material Reconciliation of Subcontractors  Preparation of As Built Drawings, Red Line Mark-up for Completed/Installed Activity and obtain approval from Client. 2. R-APDRP (Re-Accelerated Power Development Reform Programme) has been initiated by Govt. of India For Electrification & Reduce Line Losses. R-APDRP is an EPIC project of 33/11 kv overhead line & substation work. Client: PUVVNL Project Cost: 183cr INR  Erection, Testing Commissioning of New HT/LI Lines, Transformer Substations, Augmentations of Transformer S/S, HT/LT Lines.  SLD of 33kv single circuit & Double Circuit line.  33kV line Survey (Existing and Proposed), 33/11 Kv substation.  Technical Documentation.  Interaction with Vendor Companies & State Electricity Board.  Drawn up plans for equipment and rate contract for procurement of consumables.  Analyzed total scope of work and structured project budget delineating clearly the internal controls to ensure operations within budgetary parameters. . Role:  Preparing Bill of Quantity (BOQ) and bill of materials (BOM) of assigned town after completion of route survey.  Planning of work and prepared material requirement status so that work can be executed without any interruption.  Simplified all the required data so that it can be easily understandable by my subordinate.  Attending Joint Material Inspection with consignee of PUVVNL also Prepared supply bill and further process.  Execution of 11KV, 33kV, LT Lines with distribution Transformer.  Supervision & Coordination with Consultant/Contractors  Site Inspection & quality management of Consultant/Contractors  Bill processing of Client & Contractors  Material Reconciliation  Coordination with the Third-Party Inspection Team. Key Contributions:  Timely Completion of Assigned Site with anticipated Profit along with Client Satisfaction
  • Education

    • MBA in Project Management

      National Institute of Construction Management & Research(Distance Education)

      Jan 2017 - Jan 2019 - 2 yr

    • Bachelor's Degree in B.Tech

      Bharat institute of Science & Technology

      Jan 2013 

    Skills

    View More

    Languages

    • English

      Advanced

    Training & Certifications

    • MMUP/UPDA

      Engineering & Consulting Offices Accrediting Committee·2019
    • Allen Bradely PLC & Maintenance

      Advanced Training Institute·2013
    Share this Profile