profile-img

OSAMA SABRY ABDEL RAHMAN

Senior Engineering Manager at Systra

Sidi Gaber, Alexandria, Egypt

Work Experience

  • Senior Engineering ManagerFull Time

    Systra

    Jan 2021 - Present -4 yrs, 5 months

    Egypt , Cairo

    • Job Details:EET Electrical Express Train Project Client name and address: NATIONAL AUTHORITY OF TUNNEL, CAIRO Detailed project description: Electric Express Train (passengers and cargo) from El Ain El Sokhna City on the Red Sea Coast to Marsa Matrouh on the Mediterranean Coast Phase1 600 km Called Green Line, project includes the following activities. • 23 high-speed/regional stations with an average plot limit of 75000 m2 per station. • More than 50 km length viaduct bridges along the alignment including Nile crossing viaduct. • More than 170 million m3 earthwork for embankment construction including different types of slope protection. • More than 420 culverts /flood protection system. • More than 120 roadway crossings. Phase 2 FROM OCTOBER GARDENERS TO ABOU SIMBEL (BLUE LINE) ANDFROM QENA TO SAFAGA (RED LINE) (1400 km), the phase includes the following activities. • 36 high-speed/regional stations with an average plot limit of 50000 m2 per station. • More than 30 km length viaduct bridges along the alignment including 2 Nile crossing viaduct. • More than 200 million m3 earthwork for embankment construction including different types of slope protection. • More than 920 culverts /flood protection system. • More than 200 roadways underpass crossings. Modes of transport: Railway, roadway, railway bridge, roadway bridge, underpass crossing Phases: Construction, commissioning. Services: Construction, reviewing and approving transmittals, Studies, supervision. Duties include: • Manage and monitor technical design review process for package 1, assess and approve all deliverables relevant to technical coordination including related arrangement work in timely manner. • Coordinate and support the resolution of technical issues during the project construction life cycle. • Ensure the efficient integration of different fittings, elements’, and check the compatibility between the deliverables of the contracting groups. • Address technical concerns relevant to coordination and associated arrangement works. • Monitor any changes to the project relevant to coordination process and report each major change to the Client Organization. • Ensuring that the submissions comply with the design requirements and contract documentations. • Assist in the Issue the integrated coordination drawings between all contracting groups. Technical expertise: Civil engineering. 36 months on this project. Project public link: https://drive.google.com/file/d/1aHzT9XEB-fwvNyZNFyqrX6YBNTKrVC61/view?usp=drive_link
  • Senior Civil /tunnel egineerFull Time

    SYSTRA JV ECG - Engineering Consultants Group

    Jan 2015 - Feb 2021 -6 yrs, 1 month

    Egypt , Cairo

    • Job Details:•Duties include supervision over construction processes and activities , ensuring tasks are executed on time as required quality, ensuring daily logs of events associated with the work on site are maintained, witnessing and supervising commissioning and start-up activities, preparing periodical reports and the final acceptance and completion reports, reviewing and presenting contractors, reviewing and approving transmittals (design dwg, method statement and as-built drawings) For . • PORT SAID 3 TUNNEL UNDER SUEZ CANAL, Budget 16 Milliard EGP, Main Consultant SYSTRA , Project designer (SENER, Amberg Engineering), project Contractor (ORASCOM JV ARAB CONTRACTORS) and Subcontractors Trevi and Zueblin ,The project consists of Two Road Tunnels inner Dia. 11.40 m with length 3km segmental lining and 2 km cut and cover tunnel(Bottom up construction ) (including 6 evacuation cross passage) stabilized by ground freezing/ shotcrete technique and more than (350,000 M2 temporary diaphragm wall,2000,000 M3 Concreate) .
  • Construction ManagerFull Time

    ASCC

    Feb 2010 - Oct 2014 -4 yrs, 8 months

    Saudi Arabia , Abha

    • Job Details:To be responsible for the overall direction, coordination, implementation, execution, control and completion of specific projects ensuring consistency with company strategy, commitments and goals. Some of the Major Projects that I have worked in are: 3. Piping Projects. 1. Potable Water Forced Main Pipeline From khamis Mushyt to Tandaha-Torayb & Al-Arin (75 km Dia.500 mm Ductile Iron). 2. Water Transmission Project from Hili Dam to Shuaiba Station Phase 2 (83 km Dia.1400 mm Steel Pipe). 3. Allith under Ground Dame Diphragm wall subcontractor, Zetas Arabia Foundation Technology 2. Water & Wastewater Projects. 1. West Abha Reservoir Project (50000 m3). 2. East Abha Reservoir (70000 m3) + Pump Station.
  • Projects coordinator / Technical office engineer Full Time

    Anfaq CONSTRUCTION joint venture VIBREX Foundation & Tunnelingco

    May 2008 - Jan 2010 -1 yr, 8 months

    Egypt , Cairo

    • Job Details: Managing and Coordination for different projects in Egypt for both the Foundations Department and the Tunnelling Department. Some of the major projects for that I participated are: 1. Main Sewer Lines Project, North Jeddah Joint Venture with AL HARBI TRADING AND CONTRACTING COMPANY. 2. Sewerage of Glatm mnashy. 3. Marg Water Treatment Plant. 4. Sidi AbdEl Rahman Resort Community. 5. Microtunnel 2200 Mm under Qaluiob El Qanater railway. 6. Microtunnel 2200 Mm under Al ayat Waterway
  • Education

    • Transportation Engineering in Civil Engineering

      Alexandria University

      Jan 2017 - Jan 2018 - 1 Year

    • Bachelor's Degree in ENGINEERING

      Al-Azhar University

      Jan 1999 - Jan 2004 - 5 yr

    Achievements

    More than 20 years of professional experience in different fields of civil engineering & construction supervision (Transportation planning , railway engineering ,flood protection system, culverts , Workshops-depots, Catenary/Overhead contact system, Electromechanical equipment at stations Operations management, Bridges-viaducts, tunnelling TBM, ,cut and cover tunnel technique, deep foundation diaphragm wall, underground dame cut-off DW , geotechnical structural interaction , below grade waterproofing , soil improvement ,shotcrete , ground freezing, wet utilities network, open trench , micro tunnelling, Pipe jacking , water treatment plant, reservoirs , pump station, construction methodology , quantity surveying, cost estimation, planning, scheduling, cost control, quality control, health safety environmental,… etc.) • Strong Problem-solving capacity – enabler to maintain forward progress. • Excellent managerial skills for more than 7 years for several projects, strong communication ski

    Skills

    • Railway
    • Microsoft Office
    • geotechnical programs
    • Structural Analysis
    • water supply
    • Transportation engineering
    • microtunneling technology

    Languages

    • Arabic

      Fluent
    • English

      Advanced

    Training & Certifications

    • PMP

      Egyptian Engineers Syndicate, Egypt·2014
    • PRIMAVERA 8.2

      Egyptian Engineers Syndicate, ·2014
    • PRMG

      American University in Cairo ·2009
    Share this Profile