
Maher Sayed Abdellatif
Maintenance and Facility Manager at LOreal
Obour City, Cairo, EgyptWork Experience
Maintenance and Facility ManagerFull Time
LOreal
Jan 2015 - Present -10 yrs, 6 months
Egypt , Cairo
- Job Details:- Apply SHE regulations in line with the Group policy. - Organize the day-to-day operations, facility building and raw materials reception following the regulations and prevention plan. - Take part in working groups, improvement committees and transverse projects to help optimize site processes. - Draw up prevention plans for service providers and sub-contractors. - Manage the facility building and utilities distribution for the site (HVAC system, Heating, hot water, soft water, compressed air, ….). - Responsible for the Maintenance and Projects expenses, investment, and manpower budgets. - Supervise the Maintenance team, Projects team and sub-contractors team. - Coordinate maintenance and site projects with support from outside service providers and contractors. - Deal with other departments, with any anomalies in the supply of utilities, minimize all malfuncttioning of the installations or of the site’s infrastructure. - Participate in major factory projects as an expert (buildings, electricity, thermal engineering, fluid dynamics, etc.)
Technical SupervisorFull Time
LOreal
Jul 2012 - Jan 2015 -2 yrs, 6 months
Egypt , Cairo
- Job Details:- Implemented the Factory Acceptance Test (FAT) for the new equipment and machinery at the suppliers’ premises “European Region”. - Led and identified the allocation of equipment and machinery during the plant construction phase, specified the utility dropping of each and coordinated their installation. - Managed technical plan to carry out the production target with the highest possible yield while respecting quality, safety, hygiene, environment regulations and performance objectives. - Hired the technical team and set up the organizational structure, evaluation KPIs and team development plan. - Created technical maintenance schedules, technical actions and verified they are implemented correctly. - Implemented management fundamentals (day-to-day team management, held meetings, regular presentation of objectives and results to teams, top-down and bottom-up communication, etc …). - Ensured professional development of the technician’s team through training (especially new hires), transfer of information and know-how, individual reviews, performance and competencies evaluation, and progress action plans. - Ensure that product launches are effective by assessing needs for equipment/lines, in conformity with the launch schedule (participate in packaging development meetings). - Managed investments in production equipment and its maintenance according to requirements and respecting Group manufacturing rules.
Plant EngineerFull Time
Hi-Pack for Packing Materials (ARMA Group)
Jan 2009 - Jul 2012 -3 yrs, 6 months
Egypt , Cairo
- Job Details:1- Directed maintenance activities for utility systems providing continuous supply of chilled water and compressed air required for operations. 2- Managed maintenance, repair and troubleshooting of mechanical equipment including compressors, pumps, chillier, boilers, steam piping and work as owner responsibility for the Utilities Section. 3- Developed the scheduled maintenance programs and lubrication plans, overhauls, inspections, instruction books, procedures, checklists, and emergency response programs. 4- Directed and coordinated the activities of maintenance and engineering for all plant equipment and facilities to ensure a smooth-running operation. 5- Prepared short and long-term programs for equipment and facilities improvement and recommended to the engineering and operation manager for approval.
Education
MBA in general management
ESLSCA Business SchoolJan 2016 - Jan 2018 - 2 yr
BSc in Mechanical Engineering (Mechatronics Branch).
Higher Technological Institute (HTI)Jan 1998 - Jan 2003 - 5 yr
Achievements
At LOREAL, I have done the FAT for all the equipment at the supplier premises testing the lines safety, quality and performance. I was also responsible for the Factory Layout including the utility dropping connection. I have contributed in the factory start and ramp up phase. As an expert, I was in a consultancy mission in South Africa for 3 months responsible for installing a new production line including utility dropping and layout. I was also responsible for ramping up the technical staff to be able to align with LOREAL standards and safety regulations.
Skills
Languages
Arabic
FluentEnglish
Fluent
Training & Certifications
PMP
Attic Center, Maadi Egypt·2020Engineering
Advanced Technology Institute·2003