
Louie marganas Ibale
QAQC Engineer at Prowater
Pasig City, PhilippinesWork Experience
Piping EngineerFreelance / Project
Daeshin Plant Construction Company Co., LTD
Apr 2016 - Mar 2017 -11 months
Turkmenistan , Ashgabat
- Job Details:Supervise the remaining Installation of Ethane Cracker Unit. Supervise daily production activity of the welders in Heater - ECU area. It involves Piping, Structural Beam & Column, Steel Plate, and Plenum Ceiling &wall welding. Prepare daily progress report to the construction manager as summary production of all welding joints. Checked that the Welding activity of the welders is conform to the construction drawings. Checked that the Welding activity of the welders is conform to the WPS Procedure. Confirm that the job activity of the welders is conform to the specification of the project. Supervise during the erection of Piping material spools as per project specification. Checked that the erection materials(Piping spools) from the fabrication site if it is conform to the latest revision construction drawings. Confirm and recommend that the erection materials (Heater area) to be erected were approved as per project specifications. Attend the weekly meeting progress along the lead supervisors and managers. Prepare daily progress report of all erected spools. Confirm all piping spools that were already transfer to the pipe rack. Review the tender documents like Project Specifications and standard, P&ID drawings, Standard Drawings, material specification for the project, piping check list, desired requirement for piping handling and installations.
Piping EngineerFreelance / Project
Daewoo Engineering & Construction Company Co., LTD.
Mar 2014 - Mar 2015 -1 yr
Saudi Arabia
- Job Details:Prepare some Field Change Request Drawings Issued for Constructions using AUTOCAD(PCMS – 2D Modeling). Prepare some Piping Isometric layout drawings using AUTOCAD (2D Modeling) for process lines in Sales Gas Plant. Prepare Piping Material Specifications the said layout drawings. Prepare test limit layout drawings as per P&ID for Hydro Test Activity. Confirm hydrotest package both Tie-in (Shutdown Activities)and Non Tie-in Test packages(Test Packaged to be approved by PMT). Identifying of test fluid, test pressure, and test limit as per material specification within the Piping System requirement. Prepare Control Test Status for Hydrotest Activity Prepare Piping layout drawing whenever some field installation changes from the constructions. Review and checked 3D modeled Piping Plant Design using Smart Plant Review/ SPR software. Reviewing Project Design Specification to meet the project requirement. Review the tender documents like Project Specifications and standard, P&ID drawings, test limit & diagram drawings, Standard Drawings, material specification for the project, check list, desired requirement for testing packaged. Part of a Field Engineering Team
Education
Bachelor's Degree in Engineering
Technological Institute of the PhilippinesJan 2004
Languages
English
Intermediate