
Khaled Adel Ibrahim PMP RMP PMI
Construction Assistant Manager
Katameya, Cairo, EgyptWork Experience
Construction Assistant ManagerFull Time
- Job Details:Construction Assistant Manager Working in the Real State Industry , Responsible Nowadays For The Construction of 283 Villa on an area of 107 Feddans in OWEST Project 6th of October including the infrastructures . Job Description : 1- Construction supervision with the coordination between all project stakeholders . 2- Technical revision on all project documents including shop drawings , contracts , quality and safety plans . 3- Drive the Construction on site in the execution phase by monitoring and controlling all project activities . 4- support the contractor to prepare and submit what is required to solve any problem in the project , as well as supporting the Consultant in any inquiries due to any missing data in the project documents . 5- Coordinate with the authorities for any permits required before the construction phase begin , in additional to communicating with the contractor and consultant about the permit status . 6- Ensure that the project products are done within the project specifications and Quality on time with taking value engineering in consideration . 7- Prepare Detailed professional Reports for all project activates with the Earned value analysis ( s-curve) and some other details showing manpower numbers and concrete pouring quantities . 8- leading the project progress meetings with the contractor and consultant and other projects members with writing down the M.O.M .to track the progress with suitable meetings agendas. 9- Preparing and sending the formal letters on behalf of the project owner if necessary . otherwise managing all project conversations by emails as verified communication channel . 10- Create Risk Register with continues updating during the life cycle of the project . 11- Conduct Risk Review meeting on weekly basis .
Senior Project EngineerFull Time
- Job Details:- Acting As the Owner Project Manager For Different Packages. ( Construction of 20 Buildings , 120 Villas(Core and shell) , 50 Villa (Fully finished ) and Hyde park Data Center ( All project works turnkey ). - Achieving Quarter Targets Revenue . - Making Villas/Units Ready For Handing Over To clients By doing the following : 1- Execution Phase : Drive the Project Management Plan in to action by Driving the Contractor to Finish his scope of work with assuring that the consultant is Doing his Job in a Right way. 2- Monitoring and controlling Different Projects at the same Time by Walk Troughs on site and Progress Meetings . 3- Quality of Communications by Sending Formal Letters on the owner behalf for the contractor and the consultant , Preparing Weekly and Monthly Reports to Managers . 4- Closing Phase : Following and Accelerating the Process of Readiness from the contractor and meet the client requirements by Rectifying clients snags (De-Snagging ) .
Construction and Finishing EngineerFull Time
SIAC
Jun 2014 - Jun 2018 -4 yrs
Egypt
- Job Details:- From May 2017 To June 2018 Construction and Finishing Engineer Responsible for Concrete and Finishing works in a Military Mega Project . location ( New Capital ) Project value : Mega Project ( affects more that 1 million person ) Project owner : Ministry of Defense Project Main Contractor : SIAC Job Role : Construction Finishing Engineer Responsible For Concrete And Finishing Works of : Administration building of area 25,000 m2 including all Finishing and MEP works . ( HVAC, Fire fighting , Drainage ,water supply and Electrical works . ) -------------- - From May 2016 TO May 2017 Construction and Finishing Engineer att The Combined Cycle Power Planet 4800 MW Siemens ( Mega Project ) location : ( BeniSuef, Egypt ) Project value : 2 Billion Euros Project owner : Ministry of Electricity Project Main Contractor : (Siemens) Joint venture with ( El Seweedy PSP ) Job Role : Construction Finishing Engineer Responsible For Concrete And Finishing Works of : Low voltage cabin , Medium Voltage Cabin , A Chemical Dosing Building , Guards Dormitory , Air Compressor and a Water Treatment Building Concrete Structure Elements , Masonry works , Plastering , Panting, Epoxy , Anti acid Tiles , Light weight Concert, membrane isolation ,Geo textile , Granite copping ,Ceramic Flooring ,mosaic Roof tiles, Metal Frames & wooden and metal Doors installation , aluminum windows installation .. ------------------- - From November 2014 to May 2016 Finishing Engineer in Egyptian Steel Factory location (Al Ain Al Sokhna, Egypt ) Project name :Mini Mill For Production Of Steel Rebars El Ain El Sokhna Project Owner : Egyptian Steel Project Value :300 Million Egyptian Pounds Project Consultant: Danieli Responsibilities : Construction Finishing Engineer (Site Engineer ) Totally Responsible for Concrete Works & Finishing works for nearly 18 Electrical Cabins & Offices ( masonry works ,plastering, painting , doors & windows installations ,Raised Floor , false ceiling , roof isolation works , ceramic tiles , epoxy paintings, ...) General site supervisory duties for development of Steel factory plant Participated in supervisory of nearly 5 concrete structure unites. ( Water treatment Planet buildings and Electrical cabins ) Participated in construction of several drainage, electrical routing and firefighting networks Dealing with sub-contractors Ensuring site safety.
Education
Technical Diploma in PMP
American University in EgyptJan 2018 - Jan 2018 - 0 Month
Bachelor Degree in Civil Engineering
Ain Shams University (ASU)Jan 2008 - Jan 2013 - 5 yr
High School - Thanaweya Amma
El manara language school (score 98%)Jan 2007
Activities
Site Engineer at Hassan Allam constructions
Student Activity
Jun 2009 - Sep 2009 -3 months
Achievements
-Done a Very Detailed Book In Seismic Actions And Retrofitting in Ain shams University ( Academic Research ) ,Construction and finishing Works of Egyptian Steel Factory El Ain El-sokhna ,Construction and Finishing Works of administration buildings and dorms in Beni-suief Combined cycle Power Planet 4800 Mw ,Construction and Finishing works for A military Project called Al Kayan Al Askary in the new capital . ,Been Responsible as an owner Representative Engineer for ( A residential project ) cluster 8 cluster 5 , Cluster 16 & Cluster 20 in Hyde park developments.
Skills
Languages
English
FluentFrench
Intermediate
Training & Certifications
PMP
PMI·2020Project Management
AUC·2018PMP 36 Hours of Project Mangment
AMID EAST·2016IELTS
IELTS ·2016