profile-img

Khaled Mesbah

Environmental Management Specialist

Nasr City, Cairo, Egypt

Work Experience

  • Environmental Management SpecialistFull Time

    ​Masader Environmental Solutions and Energy Services

    Aug 2017 - Aug 2019 -2 yrs

    Egypt , Beni Suef

    • Job Details:Beni Suef 4800 MW CCPP - Supporting the client’s operations team in achieving compliance with relevant Egyptian laws, permit requirements and IFC Performance Standards - Leading the implementation of the environmental management system in the powerplants, specifically in the following topics: air emissions, ambient air quality, waste, cooling water, wastewater, noise, biodiversity, HSE performance indicators, overall environmental and social monitoring programme and management manual - Ensuring that environmental monitoring is performed in compliance with the applicable international standards, the regulatory and statutory requirements, as well as with the client’s specifications - Monthly reporting to Lenders on environmental and overall management system performance - Conducting daily walkthrough in the site to ensure the correct implementation of environmental plans and the implementation of corrective actions for ant previous findings. Record any new findings and highlight the issue to the relevant teams (EPC or Production Company). - Assigning duties related to environmental management to client’s staff members - Supporting the operations team in perparation for and during Lenders’ audits and representing the client (EEHC) during the audits - Leading the power plant’s enviornmental risk and non-conformity tracking and management and reporting where needed. - Providing capacity building and awareness for power plant’s operation staff on environmental management system implementation each according to his responsibilities - Review and update all environmental project plans according the requirements of IFC and local Egyptian regulations PROJECT: VIRTUAL ZERO LANDFILL SOLID WASTE MANAGEMENT SYSTEM – ABC SHARKIA PLANT - Perform detailed site waste audits and relevant document review at the ABC Sharkia Plant - Mapping of roles and responsibilities, activities, schedules for the existing WMS - Assess current WMS in light of Corporate Sustainability targets - Review existing technologies and propose cost-effective solutions for gaps between the current WMS and targeted VZL system - Prepare solution report for ABC to reach VZL
  • Site EngineerFull Time

    Saipem

    Oct 2016 - Aug 2017 -10 months

    Egypt

    • Job Details:1.Ensure correct issuing of Pipe Tracking System Records compared with applicable requirements. 2. Verify that correct hardware availability, set up, and functional status before offshore operations start up. 3. Ensure that prior to offshore operations start up ensure that applicable soft PTS Data Input has been duly cleared within barge/Vessel PTS infrastructures, and that all existing records are approved by involved parties. 4. Operate PTS during offshore operations within Corporate and Project Applicable Guidelines. 5. Identify Non-Conforming Pipes and ensure correct segregation actions as well as rejection as applicable. 6. Collect QC Inspection Records information/results to be entered into PTS in line with applicable Project PTS Procedure. 7. Ensure that Surplus/Damaged/Rejected Pipes Return activities are carried out within schedule procedures/work instructions.
  • Mud Logging EngineerFull Time

    Petroservices GmbH

    Aug 2015 - May 2016 -9 months

    Qatar

    • Job Details:1. Working in wellsite units collecting, processing, logging and analyzing geological samples 2. Using various laboratory techniques to evaluate detailed and complex data for signs of oil or gas 3. Monitoring computer recordings of drillings 4. Predicting dangerous situations, such as over-pressured formations
  • Environmental SpecialistFull Time

    Beautiful Environmental Construction

    Jun 2014 - Jul 2015 -1 yr, 1 month

    • Job Details:ERC Refinery Project 1. Soil classification and Visual Analysis. 2. Monitoring of surface and ground water level through monitoring well. 3. Hydrocarbon test (Petroflag test). 4. Quantity surveying for monthly work progress in accordance to the contract between the company and the client. 5. Preparing and modifying TRA task risk assessment. 6. Supervising Geotechnical test CBR, DDT and PLT. 7. Complete Environmental monitoring for the whole site including (vapor-odor-dust-groundwater-vibration) during UG Demolish & construction phases in accordance with the World Bank standards and Environmental Best Practice.
  • Education

    • Bachelor's Degree in Geophysics

      Ain Shams University (ASU)

      Jan 2012 

    • High School - Thanaweya Amma

      Ahmed Esmat Experimental Language School

      Jan 2008 

    Skills

    • Environmenatal
    • Environmental

    Languages

    • English

      Advanced

    Training & Certifications

    • ISO 14001 Auditor/Lead Auditor

      2019
    • EIA Principles

      Masader for Environmental Solutions·2018
    Share this Profile