profile-img

Kareem Elnaggar

Project Planning Engineer at The Petroleum Projects and Technical Consultations Company-Petrojet

Alexandria, Egypt

Work Experience

  • Project Planning EngineerFull Time

    The Petroleum Projects and Technical Consultations Company-Petrojet

    Oct 2019 - Present -5 yrs, 8 months

    Egypt , Matruh

    • Job Details:Planning and Follow-Up Engineer.  Following-up and monitoring for timely completion of (SITRA PWRI) project owned by (BAPETCO), and (ENPPI) as a client.  Day-to-day monitoring work progresses for the project and provide accurate weekly and monthly reports by swiftly communicating potential progress delays or project slippages.  Tracking and analyzing field results.  Continually make comparisons between planned progress and actual progress and report any differences to the project manager.  Studying the impact of alternative approaches.  Scheduling shutdown activities for Tie-In 90 & 91.  Coordinate between project disciplines. (Civil, mechanical, and electrical).  Update manpower and equipment list for best maneuvering to achieve the highest progress rate with the available resources.  Attend meetings with the Owner / Client and follow up on the agreed plans.  Monitor engineering drawings, documents, transmittals, and emails to keep planning and other project departments updated to new project events.  Quantity surveying as per drawings according to last updated issued for construction revisions.
  • Mechanical Construction Engineer.Full Time

    Sinoma International Engineering Co.,Ltd.

    Mar 2019 - Jul 2019 -4 months

    • Job Details:Main Duties and Responsibilities:- 1. Fabrication of Steel Structure columns, HVAC supports and pipe Supports according to drawings. 2. Checking civil foundations elevation before steel (columns / frames Erection). 3. Supervising ground assembly for main columns with beams to compose frames that can be lifted and erected at one time. 4. Erection of main steel girders and bracings between frames (with consideration of erection sequence). 5. Follow up the alignment and the bolt tightening for main members of the structure on the main Aligns and Axis before offering for inspection. 6. Supervising erection of Dressing (erection of small beams, bracings, angles, C-Channels and other medium & light steel items). 7. Through all previous steel erection steps, solution for many technical problems in erection due to material defects or wrong design to be set by my or client proposals through RFIs (Request for Information).
  • Piping EngineerFull Time

    The Petroleum Projects and Technical Consultations Company (Petrojet).

    Mar 2018 - Feb 2019 -11 months

    Egypt , Beheira

    • Job Details:Designation: - Piping Engineer. Project Name: - BP West Nile Delta Onshore Gas Development Project. Client: - Bechtel. Owner: - British Petroleum. Country: - Edku, Egypt. • Supervision of fabrication & erection of piping in the PAJB and PAGA area with total length of 20,000 linear meters of piping networks. • Co-ordination with clients, contractors, & detail engineering office. • Planning & monitoring the work for timely completion of the project. • Assure the work is carried out as per P & ID’s, layouts drawings & isometrics. • Check critical pipe supports.
  • Piping EngineerFull Time

    The Petroleum Projects And Technical Consultations Company (Petrojet).

    Oct 2016 - Feb 2018 -1 yr, 4 months

    Egypt , Alexandria

    • Job Details:Designation: - Workshop Piping Engineer-Equipment Installation Engineer. Project Name: - New CCR & Platforming Unit. Client: - Engineering for The Petroleum and Process Industries. (ENPPI). Owner: - Alexandria National Refining and Petrochemical Company (ANRPC). Country: - Alexandria, Egypt. • Preparation of piping layouts, isometrics and support Drawings. • Control spool life starting from issuing the material till handover to the site. • Revise issued material for every isometric. • Supervision of fit-up and welding work of piping in the workshop. • Following up blasting, painting and wrapping process of fabricated spools. • Managing spool storage area and movement inside the workshop premises. • Coordination with various engineering groups &site. • To undertake all necessary pre-installation checks. • To install equipment in line with company standards and current regulations. • Arrangements for lifting plan for each equipment considering: - weight of Package, crane max. capacity corresponding to counter weight, radius, height and maximum boom length.
  • Education

    • Bachelor's Degree in mechanical engineering

      Alexandria University (ALEXU)

      Jan 2008 - Jan 2013 - 5 yr

    • High School - Thanaweya Amma

      victory college

      Jan 2008 

    Skills

    • Microsoft Office
    • mechanical engneering
    • Material Control
    • Construction
    • lifting engineering
    • AutoCAD
    • Aspen Hysys

    Languages

    • English

      Fluent
    • Arabic

      Fluent

    Training & Certifications

    • ASME Section VIII Division 2.

      ASME-AUC·2019
    • ASME B 31.3 Process Piping.

      ASME-AUC·2018
    • ASNT Level II (MT, RT, PT, VT, UT).

      ASNT·2018
    • ASME B 31.1 Power Piping Design and Fabrication.

      ASME-AUC·2018
    • ASME Section VIII Division 1 Design and Fabrication for Pressure Vessels.

      ASME-AUC·2018
    Share this Profile