KA
Kamal AbdelSamie
Site Manager at Raya Leeds
6th of October, Giza, EgyptWork Experience
Projects Manager - MEP EngineerFull Time
EGEMECH - Egyptian Group for Electro Mechanicals
Oct 2011 - Dec 2014 -3 yrs, 2 months
Egypt , Cairo
- Job Details:• Installations of HVAC systems in [Raya leasing projects / North SUMID 6th of October City/Porto Cairo Mall] • Preventive and corrective maintenance of Chillers in the National institute of chest diseases Imbaba. • Preventive and corrective maintenance for the Ahli bank twin towers HVA, Plumbing works, and firefighting. • Applied Single point failure for the Ahli Bank Projects and ordered the spare parts needed in the whole project. • Established a wide network of relationships with major consultants (Shaker/EHAF/Raya corporate developers of Leed projects in Egypt), contractors and suppliers. • Handles Managing all the Building Operations Units within budget and other non-financial targets. • Created and managed teams of skilled Engineers, Technicians, Foremen and Labors. • Handled procurement. • Develops and implements a preventive maintenance plan covering civil works, plumbing works, electrical works, HVAC, refurbishment. • Applied SMACNA and ASHRAE specifications for all installation works • Direct interface with owners and consultants • Provided solutions for coordination and design problems with other trades. • Applied project Management skills from project initiation throughout planning, execution, monitoring and controlling till the closing and handing over to end user and Maintenance responsible. • Maintenance and renovation of chilled water systems, FCU’s and AHU’s. • Replacing the seamless pipe system with a new seamless pipe system. • Chemical treatment for the HVAC systems. • Installations of HVAC, firefighting and plumbing systems for VFS Marsa Matrouh and VFS Alexandria. • Researches, evaluates, and recommends new maintenance equipment & tools. • Monitors the cost and effectiveness of activities to optimize resources and spending. • Follows up on the KPIs for the building operations, and develops plans for improvement.
Project ManagerFull Time
Efficient Air, Qatar
Sep 2006 - Aug 2011 -4 yrs, 11 months
Qatar , Doha
- Job Details:• Applied project Management skills from project initiation throughout planning, execution, monitoring and controlling till the closing and handing over to end user and Maintenance responsible. • Established a wide network of relationships with major consultants, contractors and suppliers. • Monitored and controlled material purchasing process from major equipment i.e. chillers, pumps, AHUs…Etc. to minor material such as rods, supports, angles…etc. • Created and managed teams of skilled technicians, foremen and labors from diverse backgrounds. • Handled procurement. • Achieved a hands on experience to all installation processes of all kinds of HVAC systems i. Equipment installations ii. Piping layout (chilled water or copper pipes) iii. Ductwork networks ( GI or pre-insulated) iv. Electrical works in connection v. Balancing , testing and startup of the system vi. Ventilation and pressurization system • Provided solutions for coordination and design problems with other trades. • Acquired a wide experience in most popular HVAC equipments such as Carrier, Daikin, and Mitsubishi and Trane products. • Applied company’s policy in using latest technologies in installations, most environmentally friendly materials to achieve most efficient system for end user not neglecting its environmental impact. • Studied Operation & Maintenance Manuals of all Daikin A/C units from unitary split units to VRV systems. • Managed and assessed a team of professional maintenance technicians and foreman • maintenance projects following the below steps: i. Using the operating and maintenance manuals from all manufacturers to provide a concrete blueprint for the steps required to maintain all the HVAC system equipments such as Chillers ,AHUs, pumps, FCUs …etc ii. Study the status of the existing HVAC system and create accordingly a tailored preventive and protective maintenance program. iii. Secured maintenance contracts for 12 million QAR iv. Input all the maintenance tasks needed to be done monthly, quarterly, annually into maintenance management system along with all the documentation that goes with it to make sure its accessible to other team members to increase efficiency of operations and improve responding to arising problems before they reach crisis. v. Perform a life cycle cost analysis to all the equipments to find out which will be more feasible replacing it or repairing it. vi. Presented maintenance proposals to in house projects, maintenance tenders and walk in customers vii. Prepared material requisitions and maintained stock position such that all essential equipments and materials are available when needed viii. Ensuring that the Mechanical systems under Technical facilities scope are being maintained up to the contractual specifications, CMMS (Computerized Maintenance Management System) and industries' best practices.
Education
BSC of Mechanical Engineering in Mechanical Engineering
University of Derby UKJan 2005 - Jan 2009 - 4 yr
Achievements
CLAC certified
Languages
English
FluentArabic
Fluent