profile-img

John yossef Asaad

john_yousef88@yahoo.com

Moharam Bek, Alexandria, Egypt

Work Experience

  • Senior Mechanical Maintenance EngineerFull Time

    Beshay Steel Company ( Light Section Mill )

    Dec 2011 - Present -13 yrs, 6 months

    Egypt , Monufya

    • Job Details:• Supervise scheduled and unscheduled maintenance including all routine inspections and service overhauls. • To coordinate with the Shift Engineers for engineering support. • Assist maintenance technicians on projects that require higher-level engineering analysis. • Co-ordinate with other sections for smooth operation. • To prepare the needed items for maintenance day and follow up. • To Prepare and maintain documents as per ISO certificate. • KPI , down times and miss-rolls analysis • Secured capital equipment for facility by developing quotations and purchase requisitions. • Attended the first start-up and Commissioning of the ESISCO Section mill plant by Danieli Co. • Assist in furnace Revamping with DANIELI Co team. (Install new combustion and exhaust fans, modify 2 zones in furnace burners, install billet turning device instead of normal slab). • Assist in EWR machine revamping with DANIELI Co
  • Education

    • Bachelor's Degree in Mechanical power department

      Helwan University

      Jan 2011 

    Achievements

    • Increased efficiency of Metal Disk in Saws by 15% with modifying all the saw speeds and water cooling manifold. • Reduced time of disassembling of Looper Pneumatic Cylinder by 60 % with modifying the base plate fixation. • Disassembly more than 50 cylinders and draw them with the full details. • Decrease miss rolls in Rebar sizes by changing stands lead speed and changing shear pins. • Decrease changing time for Finishing stands by fabrication manual clamps instead of hydraulic to avoid the repeated stuck problems. • Decrease bearing damage for Stands entry and exit guide due to less grease by changing the place of grease distributers to be easy to change if damage. • Change fixation of Disk saw lower clamps to reduce time of changing • Fix ball valves on main grease lines for each stand to reduce time for checking the centralized grease unit.

    Skills

    • Technical Presentations
    • •Bill of Material (BOM)
    • Engineering
    • 5S Lean Manufacturing Methodology
    • • AutoDesk Inventor.
    • Risk Assessment

    Languages

    • English

      Advanced

    Training & Certifications

    • Bearing Maintenance & Service

      SKF·2018
    • 5s

      Beshay steel academy·2016
    • Advanced lubrication training course

      Exxon Mobil·2015
    • Iso Internal audit

      Beshay Steel Acadmy·2014
    Share this Profile