profile-img

Islam Shaker Shakal

Project Manager at Concorde

Ard Sultan, Minya, Egypt

Work Experience

  • Project ManagerFull Time

    Concorde

    Oct 2021 - Present -3 yrs, 9 months

    • Job Details:Working for CONCORD for Engineering and Contracting as a Project Manager in charge of the implementation of A sewage treatment plant in BELHASA with a capacity of (15/20) thousand m3/day at BELHASA- Minya within the initiative of HAYAH KARIMA with Estimated value of 700 million L.E. Below is a brief explanation of the work inside the Plant: ▪ Initiate a teamwork. ▪ Excavation, Replacement soil installation and compaction, Formwork installation, Insulation works (internal / external). All of those operations are implemented for all the construction of the Plant such as Tanks (rectangular or circular) and Head works.
  • Senior Civil Engineer/deputy station managerFull Time

    Efjv By Vinci Construction

    Oct 2017 - Oct 2021 -4 yrs

    Egypt , Cairo

    • Job Details:Working with French Company (VINCI Construction) as a deputy station manager in charge of the implementation of Greater Cairo Metro AL THAWRA Line (Line 3 Phase3 – OG department) at Ring Road Station. ▪ Site Installation and preparation. ▪ Utilities Investigations. ▪ Piling Works diameter (800mm, 1500mm, 1000mm & 2400mm). ▪ Implementation of pile caps, columns, Abutments, Lower deck, Webs, Top deck, Slabs ……. etc. ▪ Preparation of the monthly schedule and planning. ▪ Preparation of work procedures and reports (Daily, Weekly & Monthly).
  • senior engineerFull Time

    Madhamen for construction - KSA

    May 2014 - Sep 2017 -3 yrs, 4 months

    Saudi Arabia , Al Ahsa

    • Job Details:ALHASSA, Kingdome of Saudi Arabia Worked as Senior Engineer in charge of the implementation of the networks and the pumping station in a special project on irrigation and drainage authority at ALHASSA, as well as the design guidelines (Profiles) of the network lines within the project for the transferring of open irrigation channels to closed pipeline Sector No (5) and the main pumping station (F1) project value is 130,000,000 SAR.
  • Civil Site EngineerFull Time

    Madhamen for construction - KSA

    May 2012 - May 2014 -2 yrs

    Saudi Arabia , Al Ahsa

    • Job Details:ALHASSA, Kingdome of Saudi Arabia ALHASSA, Kingdome of Saudi Arabia Worked as Site Engineer in charge of the implementation of the water network and household connections in the eastern villages at ALHASSA first decade worth. Project value is 51,000,000 SAR. Preparation of the profiles, as built for the water lines of the project and handed over.
  • Education

    • Bachelor's Degree in civil engineering

      Minia University

      Jan 2009 

    Skills

    • Computer Programs
    • Computer Engineering
    • Computer Skills
    • Follow Up
    • Planning
    • Scheduling
    • Time Scheduling
    • work procedure
    • daily report
    • Weekly Report
    View More

    Languages

    • English

      Advanced

    Training & Certifications

    • Projects Management Professional PMP

      Project Management Institute PMI·2023
    • Risk Management Professional RMP

      Privat Training·2022
    Share this Profile