profile-img

islam aly farag

Construction Manager at Consolidated Contractors International Company, (Kuwait) W.L.L

Al Ahmadi, Kuwait

Work Experience

  • Construction ManagerFull Time

    Consolidated Contractors International Company, (Kuwait) W.L.L

    Dec 2016 - Present -8 yrs, 7 months

    Kuwait , Al Ahmadi

    • Job Details:(Mina Abdullah Refinery, Clean Fuels Project - CFP). CLIENT: KUWAIT NATIONAL PETROLEUM COMPANY - KNPC MAIN CONTRACTOR: PETROFAC/ SAMSUNG/ CBI JV (PSCJV) Construction Manager - UNIT 111 , UNIT 112 , UNIT 113 , UNIT 212 & UNIT 216 (CFP-MAB 1): ♣ Managing & Coordinating Multi-discipline Engineering activities including piping, equipment and steel structure from mobilization to handover, through construction and PMC on site to ensure project is executed in a safe, efficient, cost effective & timely manner. ♣ Ensuring that the scope of work is achieved in accordance with contract requirements and time frames, and in compliance with specifications and standards established. ♣ Ensuring the execution of quality work that complies with HSE standards. ♣ Controlling and coordinating different disciplines (Piping, Equipment, Steel structure, Civil, E&I and Scaffolding) activities to be completed on schedule. ♣ Budget Preparations, Manpower & Equipment Mobilization and Procurement. ♣ Participation in Project planning and scheduling. ♣ Progress monitoring and control. ♣ Effective management of the project area to ensure conformance with the Client’s approved design and all applicable regulatory code requirements. ♣ Providing guidance on interpretation of mechanical construction. ♣ Managing & Coordinating Line-up and Reinstatement activities for Pre-Mechanical Completion activities. TOTAL SCOPE OF WORK in (CFP PROJECT) ♦ U/G Pipe erection, testing : 349,563 (inch-meter) ♦ A/g piping (LB+SB) erection : 561,844 (inch-dia) ♦ Piping erection nos. : 38,509 (Spools+ SFRs) ♦ Total pipe supports erection : 902 Ton ♦ A/G pipe testing : 5,818 Test Packs ♦ U/G pipe testing : 746 Test Packs ♦ Steel erection : 35,198 Ton
  • Construction Manager (Mechanical)Full Time

    Consolidated Contractors International Company, Qatar

    Aug 2014 - Nov 2016 -2 yrs, 2 months

    Qatar , Doha

    • Job Details:(Laffan Refinery Company Limited 2 Project - LR2). CLIENT: QATAR GAS MAIN CONTRACTOR: CHIYODA/ CTCI JV (CCJV) Construction Manager (Mechanical) - ISBL GREEN FIELDS (LR2 SITE): ♣ Managing & Coordinating Multi-discipline Engineering activities on site to ensure project is executed in a safe, efficient, cost effective & timely manner. ♣ Effective management of the project area to ensure conformance with the Client’s approved design and all applicable regulatory code requirements. ♣ Responsible for Project Planning and Construction ♣ Providing guidance on interpretation of mechanical drawings for piping works: Isometric, General Arrangement & P&IDs for the construction ♣ Planning of work schedule/sequence using the available resources, human & material(s) to meet company’s daily, weekly & monthly targets. This was achieved using the weekly PSMS reports. ♣ Coordinating the fabrication & erection of Supports on piping ♣ In charge of piping erection up to PMC handover with accordance to the project specifications and schedule. ♣ Coordinating the completion of allocated Test Packs on weekly basis. ♣ Coordinating the modification of project drawings and As-Built drawings as may be required by the operating party. ♣ Responsible for the overall execution of the project as per specifications & the general safety of lives and property on site. ♣ Managing & Coordinating Line-up and Reinstatement activities for Pre-Mechanical Completion activities. TOTAL SCOPE OF WORK IN (LR2 PROJECT) ♦ A/g piping (LB+SB) erection : 215,980 (inch-dia.) ♦ Piping erection nos. : 27,276 (Spools + SFRs) ♦ Total pipe supports erection : 752 Ton ♦ A/G pipe testing : 2,124 Test Packs ♦ U/G pipe testing : 898 Test Packs - TSF AREA (Fabrication, Painting, PWHT & Spools Laydown): ♣ Managing & Organizing Multi-discipline Engineering activities on TSF to ensure safe, efficient, cost effective and timely project execution. ♣ Effective management of the project area to ensure conformance with the Client’s approved design and all applicable regulatory code requirements. ♣ Responsible for Project Planning and Construction. ♣ Providing guidance on interpretation of mechanical drawings for piping works: Isometric, General Arrangement & P&IDs for the construction. ♣ Planning of work schedule/sequence using the available resources, human & material(s) to meet company’s daily, weekly & monthly targets. This was achieved using the weekly TALISMAN reports. ♣ In charge of LB and SB piping fabrication, PWHT and painting with accordance to the project specifications and schedule. ♣ Coordinating the modification of project drawings and As-Built drawings as may be required by the operating party. ♣ Responsible for the overall execution of the project as per specifications & the general safety of lives and property on site. TOTAL FABRICATION SCOPE OF WORK IN (LR2 PROJECT) ♦ A/G piping (LB+SB) fabrication : 487,352 (inch-dia.) ♦ Total pipe supports fabrication : 752 Ton ♦ Total E&I pipe supports fabrication : 326 Ton ♦ Total insert (Embedded items) fabrication : 545 Ton ♦ Painting surface area : 127,404 M2 ♦ PWHT work : 112,731 (inch-dia.)
  • Project Engineer (Mechanical)Full Time

    Consolidated Contractors International Company, Qatar

    Jan 2011 - Jul 2014 -3 yrs, 6 months

    Qatar , Dukhan

    • Job Details:(Gas Sweetening Facilities Project - GSF). CLIENT: QATAR PETROLUIM MAIN CONTRACTOR: PETROFAC INTERNATIONAL LIMITED (PIL) Project Engineer (Mechanical) ♣ In charge of full Mobilization of company’s camp in Dukhan, and temporary site facilities. ♣ Managing & Organizing Multi-discipline Engineering activities on site to ensure safe, efficient, cost effective and timely project execution. ♣ Effective management of the project area to ensure conformance with the Client’s approved design and all applicable regulatory code requirements. ♣ Responsible for Project Planning and Construction. ♣ Providing guidance on interpretation of mechanical drawings for piping works: Isometric, General Arrangement & P&IDs for the construction. ♣ Planning of work schedule/sequence using the available resources, human & material(s) to meet company’s daily, weekly & monthly targets. This was achieved using the weekly TALISMAN reports. ♣ In charge of structure steel erection in Dukhan site with accordance to the project specifications and schedule. ♣ In charge of LB and SB piping fabrication and painting with accordance to the project specifications and schedule. ♣ In charge of piping erection up to PMC handover with accordance to the project specifications and schedule. ♣ Coordinating the completion of allocated Test Packs on weekly basis. ♣ Coordinating the modification of project drawings and As-Built drawings as may be required by the operating party. ♣ Responsible for the overall execution of the project as per specifications & hence the general safety of lives and property on site. ♣ Managing & Coordinating Line-up and Reinstatement activities for Pre-Mechanical Completion Activities. TOTAL SCOPE OF WORK IN (GSF PROJECT) ♦ A/g piping (LB+SB) erection & fabrication : 267,724 (inch-dia.) ♦ Piping erection nos. : 15,847 (Spools + SFRs) ♦ Total pipe supports erection : 346 ton ♦ A/G pipe testing : 2,061 Test Packs ♦ U/G pipe testing : 125 Test Packs ♦ Hot insulation : 12,092 sq.m ♦ Cold insulation : 1,512 sq.m ♦ Steel erection : 4,568 ton
  • Project Engineer (Mechanical)Full Time

    Consolidated Contractors International Company, Qatar

    Mar 2009 - Dec 2010 -1 yr, 9 months

    Qatar , Doha

    • Job Details:(QCS 3&4 LNG Onshore Facilities Project/ Train 7) CLIENT: QATAR GAS/CONOCO PHILIPS/SHELL MAIN CONTRACTOR: CHIYODA/ TECHNIP JV (CTJV) Project Engineer (Mechanical) ♣ Managing & Coordinating Multi-discipline Engineering activities on site to ensure project is executed in a safe, efficient, cost effective & timely manner. ♣ Effective management of the project area to ensure conformance with the clients approved design and all applicable regulatory code requirements. ♣ Responsible for Project Planning and Construction ♣ Providing guidance on interpretation of mechanical drawings for piping works: Isometric, General Arrangement & P&IDs for the construction ♣ Planning of work schedule/sequence using the available resources, human & material(s) to meet company’s daily, weekly & monthly targets. This was achieved using the weekly TALISMAN reports. ♣ Coordinating the fabrication & erection of Supports on piping ♣ Coordinating the completion of allocated Test Packs on weekly basis. ♣ Coordinating the modification of project drawings and As-Built drawings as may be required by the operating party. ♣ Responsible for the overall execution of the projects specification & the general safety of lives and property on site. ♣ Managing & Coordinating Line-up and Reinstatement activities for Pre-Mechanical Completion activities. TOTAL SCOPE OF WORK IN TRAIN 7 (QCS PROJECT) ♦ A/G piping (LB+SB) erection : 403,000 (inch-dia.) ♦ Piping erection nos. : 37,500 (Spools+ SFRs) ♦ Total pipe supports erection : 2,500 ton ♦ A/G pipe testing : 3,200 Test Packs ♦ U/G pipe testing : 125 Test Packs ♦ Hot insulation : 86,000 sq.m ♦ Cold insulation : 40,300 sq.m ♦ Steel erection : 11,200 ton
  • Education

    • Bachelor's Degree in Mechanical Engineering

      Alexandria University

      Jan 1995 

    Skills

    • Word, Excel, Access and other computer packages.
    • planning skills

    Languages

    • English

      Fluent
    Share this Profile