profile-img

Ibrahim Abdelhamid

Project Manager at HATCOM for Trading and Contracting, Qatar

Al Wakrah, Qatar

Work Experience

  • Project ManagerFull Time

    HATCOM for Trading and Contracting, Qatar

    Apr 2015 - Present -10 yrs, 2 months

    Qatar , Doha

    • Job Details: Spearheaded 11 major projects (3 Turnkey) orchestrating planning, development, client requirements, scope and timeline.  Directed a team of 34 (2 Site Engineer, 2 Civil Supervisors, 2 Rigging Supervisors, 6 Civil Foreman, 7 Rigger Foreman, 3 Electrical supervisors, 6 Electrician, 4 Draftsman, 2 Site Acquisition Specialists) and supervised team performance.  Prepared P&L Statements and Financial Status Reports and recommended if the project is to be implemented.  Performed technical site surveys, created customized solutions and presented the same via layout sketches.  Scheduled and conducted site visits to clarify progress considering project milestones to ensure 100% customer satisfaction.  Contemplated tender proposals, performed cost analysis and prepared technical and commercial packages.  Developed new designs and introduced process improvements, thereby reducing costs by 25% while sustaining quality. Major Projects:  Turnkey Project for Expansion of GSM Network for Vodafone-Qatar.  Supply and Installation of 57 Sites (15 Rooftop, 30 RDS and 12 RDM).  Supply and Installation of 123 Sites (31 Rooftop, 16 RDS, 17 Greenfield Monopole, 57 RDM and 2 Palm Tree).  Turnkey Project for Expansion of 4G Network for Vodafone-Qatar.  Supply and Installation of 214 Sites (42 Rooftop, 23 RDS, 8 Palm Tree, 106 RDM, 22 RDP, 8 RDB and 5 Sharing Sites).  Turnkey Project for Expansion of 5G Network for Vodafone-Qatar.  Supply and Installation of 116 Sites (105 Rooftop and 11 Greenfield).  Manufacturing, Supply and Installation of Telecom Shelters for Central Office (13 Sites).  Manufacturing, Supply and Installation of Cell on Wheel Solutions (40 Sites).  Telecom Data Centers (1 Site).  Supply, Installation and Commissioning of Power Generators (30 Sites).  Refurbishment works for existing 50m towers and their foundations.  Supply and Installation of 48m SSS Tower and 48m Guyed Mast for Qatar Meteorology Department.  Design, Manufacturing and Installation of Rooftop steel structures and ground foundations for IP-TV satellite antennas on Vodafone-Qatar landing Station.  Supply and Installation of 35m RDS Structure at American Army Base.
  • Project EngineerFull Time

    Madar Soft

    Jun 2011 - Apr 2015 -3 yrs, 10 months

    Egypt , Alexandria

    • Job Details:• Directed 9 headline projects from scratch overseeing strategizing, implementation, client demands, framework and schedule. • Controlled a team of 22 (3 Civil Supervisors + 2 Rigging Supervisors + 4 Civil Foreman + 6 Rigging Foreman+ 2 Electrical supervisors + 2 Draftsman + 3 Site Acquisition Specialists) beside Subcontractor teams and administered team performance. • Monitored compliances to 5 parts (applicable codes, practices, QA/QC policies, performance standards and specifications). • Attended civil & telecom Preliminary Acceptance Test (PAT) and guaranteed site readiness from all aspects. • Developed a strong vendor network and project strategies facilitating revenue savings and efficiency by 15%. Major Projects: • 3G Phase 6 & Mecca Hajj Turnkey Project for construction of GSM Sites for Saudi Telecom Company (50 Sites). • 4G Phase 1 Turnkey Project for Saudi Telecom Company (25 Sites). • 4G Phase 2 Turnkey Project for Saudi Telecom Company (38 Sites). • 4G Phase 3 Turnkey Project for Saudi Telecom Company (50 Sites). • Turnkey project for Civil Works of WIMAX and MW Links for GO Company (9 Sites). • Supply, Installation & Commissioning of Genset system for GO Company (15 Sites). • Implementation of 4G Turnkey sites for Mobily Company (15 Sites).
  • Electrical Maintenance EngineerFull Time

    Egyptian Copper Works Company, Egypt

    Dec 2009 - Jun 2011 -1 yr, 6 months

    Egypt , Alexandria

    • Job Details:• Planned and originated 4 headline projects from the ground up monitoring client needs, delivery schedule and project extent. • Controlled a team of 13 [Electrical Supervisors (3) + Electrical foreman (4) + Electricians (6)]. • Programmed and designed a software for programmable logic controller, drives, sensors, counters and controllers improving efficiency by 70%. • Investigated electrical and electronic failures, discovered the reasons for the failures and solved machines operating problems. Major Projects: 1- Planning, designing and commissioning for new machines of steel wire drawing and steel ropes stranding. 2- Upgrading and developing of old machines of steel wires drawing and steel ropes stranding. 3- Upgrading and developing of heat treatment and galvanization lines. 4- Participating in the IT project to link all the factories together with one network and provide them with computer devices, network hardware and software.
  • Education

    • Bachelor's Degree in Electrical Engineering, Communications and Electronics Section

      Alexandria University (ALEXU)

      Jan 2009 

    • High School - Thanaweya Amma

      Dhufar Secondary School

      Jan 2004 

    Achievements

    •Spearheaded 11 major projects (3 Turnkey) orchestrating planning, development, client requirements, scope and timeline. •Developed new designs and introduced process improvements, thereby reducing costs by 25% while sustaining quality. •I have completed several turnkey civil works projects for telecommunication sites (Rooftop and Greenfield) and here are some of those projects: • Turnkey Project for Expansion of GSM Network for Vodafone-Qatar.  Supply and Installation of 57 Sites (15 Rooftop, 30 RDS and 12 RDM]  Supply and Installation of 123 Sites (31 Rooftop, 16 RDS, 19 GF, 57 RDM) • Turnkey Project for Expansion of 4G Network for Vodafone-Qatar.  Supply and Installation of 214 Sites (42 Rooftop, 23 RDS, 8 Palm Tree, 106 RDM, 22 RDP, 8 RDB, 5 Sharing Sites). • Turnkey Project for Expansion of 5G Network for Vodafone-Qatar.  Supply and Installation of 116 Sites (105 Rooftop and 11 Greenfield) • 3G Phase 6 & Mecca Hajj Turnkey Project for construction of GSM Sites (50 Sites).

    Skills

    • Project Management
    • Project Planning
    • Cost Estimating
    • Quick Learner
    • flexibility
    • self-motivation
    • Leadership skills
    • Time Management
    • Problem-Solving
    • Decision Making
    View More

    Languages

    • Arabic

      Fluent
    • English

      Advanced

    Training & Certifications

    • Basics of Project Management

      International Business Management Institute·2021
    • Project Management (Short Course)

      eLearning College·2021
    • IELTS

      British Council·2020
    • CEFR B2

      British Council·2020
    • PMP Training

      MMTI·2019
    • Working at Height and Rescue Certificate

      Falck Safety Services Qatar·2017
    • OSHA Compliance Certificate

      NSC·2014
    • ICDL

      UNESCO·2011
    • IT Essentials:

      Cisco Systems·2010
    • Mobile Package (GSM, UMTS, LTE & 4G)

      Legend·2009
    • Auto CAD

      Faculty of Engineering·2008
    • Microcontroller AVR programming

      IEEE·2008
    • HTML

      Faculty of Engineering·2006
    Share this Profile