
Fathy Gamil Amin
Self employee.
Giza, Giza, EgyptWork Experience
Self employee.Full Time
Osool for trading and contracting
Jan 2016 - Jan 2020 -4 yrs
Egypt , Giza
- Job Details:- Co-Founder and partner in a general electromechanical contracting company. Supervise all phases of management operations, including; engineering, tendering, pricing, procurement and projects implementation. - The scope of work is including supply and install all electromechanical system:- electrical, mechanical, fire fighting and plumbing (MEP), From providing complete solutions through Design and Build to Engineering, Procurement and Construction. (EPC)
Projects and Maintenance Engineer.Full Time
Tercel Oilfield
Mar 2008 - Aug 2013 -5 yrs, 5 months
United Arab Emirates , Dubai
- Job Details:-Makes regular inspection of plant service areas and utilities supply facilities, to ensure proper functioning at all times. (The facility contains different types of 4 axis CNC turning and milling M/C’s). -Plans, organizes, coordinates the preventive maintenance plan for all machines. -Troubleshooting for any mechanical and electrical emergency breakdown. -Repairs & equipments modification “e.g. to improve process safety or to Resolve process bottlenecks”. -Negotiates pertinent service contracts, and ensures that the adequate services Are received. Prepares activity reports with services providers. (For A.C’s, Generators, air compressors, and forklifts). -Controls storage and availability of maintenance supplies, spare parts and Tools, this includes purchasing decisions. -Controls the administrative work such as preparation of maintenance Budget, spare parts stock control, assessing utilities consumption, check suppliers invoices, maintains Master files of buildings and facilities construction plans and maintenance Procedures. -Responsible about write-up, approval and execution of all internal projects and modifications, which involve saving, improvement and infrastructure projects. -Ensures that the manufacturing facilities and pertinent service and Utilities systems are continually in perfect operating condition. -Participate in the internal audits for other departments.
Maintenance and maintenance planning section head.Full Time
MISR COMPROSSOR Mfg Company
Jan 2000 - Feb 2008 -8 yrs, 1 month
Egypt , Cairo
- Job Details:-Team leader for mech. and elec. Utilities Technicians. -Schedule and implement planned preventive maintenance, corrective Maintenance and major repair activities as well as diagnose trouble Shooting of all factory's machines (Hydraulic & pneumatic systems, Gear boxes, spindles, Conveyors, motors, heat Treatment machines, ovens etc.) -Maintain the mechanical and electrical systems for Utility Machines (Air Compressors, chillers, boilers, Electrical station, Generators, pumps, etc), maintaining pipes line for steam, chilled water and compressed air. -Tools (drills, reamers, inserts) and Dies sharpening workshop responsible. -Team leader for the maintenance team to implement the Oracle software Project to control all maintenance activities by Oracle Data Base system. -Plan and follow up the scheduled preventive maintenance work orders. -Analysis the machines stopping time caused by unscheduled Corrective Actions, and Plan for actions required to solve long term Problems (Mechanical and electrical), using Microsoft Project program. -Participate in solving machine's trouble shootings. -Follow up the stock of spare parts and purchasing orders. -Monthly reporting to the Maintenance Manager about all maintenance activities
Education
Bachelor's Degree in Mechanical power engineering
Benha UniversityJan 1993 - Jan 1998 - 5 yr
High School - Thanaweya Amma
ALORMAN SECONDARY SCHOOLJan 1993
Achievements
- Co-Founder for a contracting company. - Set up maintenance system, which includes hiring technician, machines and parts coding, preventive maintenance plan, maintenance system documents (maintenance request, machine history file, weekly checklist, Reduce machines stopping time, which affects productivity. - Preparing emergency spare parts list for machines to be in stock. - Make energy audit for the workshop and redistribute the electric loads in Sufficient way which reduced power cost. - Coordinate for moving our shop to new facility, which includes: - reviewing the final drawings for the machines layout, machines supplying utilities (Electric, water, air, etc), and follow up the plan of the project with the contractors and the project manager. -During my first year work; I passed an IT diploma (900 Hr).at IBM -I was a team leader during the graduation project. -I was a team leader to set up a maintenance software by oracle
Skills
- Microsoft Office
- Internet
- AutoCAD
- Mechanical
- Management
- Inspection
- Maintenance
- Troubleshooting
- Mechanical
- Planned Preventative Maintenance (PPM)
Languages
Arabic
FluentEnglish
FluentFrench
Intermediate
Training & Certifications
Marketing fundmentals
EDX·2021Financial analysis
LinkedIn·2021Strategic Negotiation
LinkedIn·2021Project manager learning Path
LinkedIn·2021SWOT analysis
Udemy·2020Internal Audit course
DUBAI·2009-Leadership Development
DUBAI·2008Certified Energy Manager Course
IEEE·2008Preventive Maintenance course - CMMS
FTL institut·2006Total Productive Maintenance & 5S concepts
Ministry of Industry·2005CIW
IBM·2001