profile-img

Fathy Gamil Amin

Self employee.

Giza, Giza, Egypt

Work Experience

  • Self employee.Full Time

    Osool for trading and contracting

    Jan 2016 - Jan 2020 -4 yrs

    Egypt , Giza

    • Job Details:- Co-Founder and partner in a general electromechanical contracting company. Supervise all phases of management operations, including; engineering, tendering, pricing, procurement and projects implementation. - The scope of work is including supply and install all electromechanical system:- electrical, mechanical, fire fighting and plumbing (MEP), From providing complete solutions through Design and Build to Engineering, Procurement and Construction. (EPC)
  • Projects and Maintenance Engineer.Full Time

    Tercel Oilfield

    Mar 2008 - Aug 2013 -5 yrs, 5 months

    United Arab Emirates , Dubai

    • Job Details:-Makes regular inspection of plant service areas and utilities supply facilities, to ensure proper functioning at all times. (The facility contains different types of 4 axis CNC turning and milling M/C’s). -Plans, organizes, coordinates the preventive maintenance plan for all machines. -Troubleshooting for any mechanical and electrical emergency breakdown. -Repairs & equipments modification “e.g. to improve process safety or to Resolve process bottlenecks”. -Negotiates pertinent service contracts, and ensures that the adequate services Are received. Prepares activity reports with services providers. (For A.C’s, Generators, air compressors, and forklifts). -Controls storage and availability of maintenance supplies, spare parts and Tools, this includes purchasing decisions. -Controls the administrative work such as preparation of maintenance Budget, spare parts stock control, assessing utilities consumption, check suppliers invoices, maintains Master files of buildings and facilities construction plans and maintenance Procedures. -Responsible about write-up, approval and execution of all internal projects and modifications, which involve saving, improvement and infrastructure projects. -Ensures that the manufacturing facilities and pertinent service and Utilities systems are continually in perfect operating condition. -Participate in the internal audits for other departments.
  • Maintenance and maintenance planning section head.Full Time

    MISR COMPROSSOR Mfg Company

    Jan 2000 - Feb 2008 -8 yrs, 1 month

    Egypt , Cairo

    • Job Details:-Team leader for mech. and elec. Utilities Technicians. -Schedule and implement planned preventive maintenance, corrective Maintenance and major repair activities as well as diagnose trouble Shooting of all factory's machines (Hydraulic & pneumatic systems, Gear boxes, spindles, Conveyors, motors, heat Treatment machines, ovens etc.) -Maintain the mechanical and electrical systems for Utility Machines (Air Compressors, chillers, boilers, Electrical station, Generators, pumps, etc), maintaining pipes line for steam, chilled water and compressed air. -Tools (drills, reamers, inserts) and Dies sharpening workshop responsible. -Team leader for the maintenance team to implement the Oracle software Project to control all maintenance activities by Oracle Data Base system. -Plan and follow up the scheduled preventive maintenance work orders. -Analysis the machines stopping time caused by unscheduled Corrective Actions, and Plan for actions required to solve long term Problems (Mechanical and electrical), using Microsoft Project program. -Participate in solving machine's trouble shootings. -Follow up the stock of spare parts and purchasing orders. -Monthly reporting to the Maintenance Manager about all maintenance activities
  • Education

    • Bachelor's Degree in Mechanical power engineering

      Benha University

      Jan 1993 - Jan 1998 - 5 yr

    • High School - Thanaweya Amma

      ALORMAN SECONDARY SCHOOL

      Jan 1993 

    Achievements

    - Co-Founder for a contracting company. - Set up maintenance system, which includes hiring technician, machines and parts coding, preventive maintenance plan, maintenance system documents (maintenance request, machine history file, weekly checklist, Reduce machines stopping time, which affects productivity. - Preparing emergency spare parts list for machines to be in stock. - Make energy audit for the workshop and redistribute the electric loads in Sufficient way which reduced power cost. - Coordinate for moving our shop to new facility, which includes: - reviewing the final drawings for the machines layout, machines supplying utilities (Electric, water, air, etc), and follow up the plan of the project with the contractors and the project manager. -During my first year work; I passed an IT diploma (900 Hr).at IBM -I was a team leader during the graduation project. -I was a team leader to set up a maintenance software by oracle

    Skills

    • Microsoft Office
    • Internet
    • AutoCAD
    • Mechanical
    • Management
    • Inspection
    • Maintenance
    • Troubleshooting
    • Mechanical
    • Planned Preventative Maintenance (PPM)
    View More

    Languages

    • Arabic

      Fluent
    • English

      Fluent
    • French

      Intermediate

    Training & Certifications

    • Marketing fundmentals

      EDX·2021
    • Financial analysis

      LinkedIn·2021
    • Strategic Negotiation

      LinkedIn·2021
    • Project manager learning Path

      LinkedIn·2021
    • SWOT analysis

      Udemy·2020
    • Internal Audit course

      DUBAI·2009
    • -Leadership Development

      DUBAI·2008
    • Certified Energy Manager Course

      IEEE·2008
    • Preventive Maintenance course - CMMS

      FTL institut·2006
    • Total Productive Maintenance & 5S concepts

      Ministry of Industry·2005
    • CIW

      IBM·2001
    Share this Profile