
Fady Adel Naguib
Senior Site Engineer at Orascom
Shubra, Cairo, EgyptWork Experience
Senior Site EngineerFull Time
Jun 2022 - Present -3 yrs, 1 month
Egypt , Alexandria
- Job Details:Passenger Terminal Building (PTB) Area: 66402 m2 with secondary buildings like Water Tank, Electric Stations, Fuel Tanks, Solar Energy Equipments Rooms & Workshops. All Concrete works from excavations to Finishing works (Mega Project Scale). Architectural finishing include: Masonry, Plaster, Painting, Gypsum board ceiling and partitions, Insulation, Imported and local Porclien, Alico aluminums, Franc Metal Doors, Degips woods, Acoustical ceiling, Raised floor for electric and it rooms, Signage and Handrails, Epoxy flooring and Stairs, Access doors, Marbles and vanity tops, Cladding, Corian Counters First Concept, Garbage sheids, Rolling shutter doors, Fire and non-fire sealants, Expansion Joints Mancorp, Steel Frames Mancrew, Strip dividers. Car Park Area: 114130 m2 Excavation works till datum level with all infrastructure works like sewage lines, irrigation lines…etc. Layers ( Sub grade, Sub base, Base Coarse, Primer Coat ) Landscape. Apron Area: 145136 m2 Excavation works till datum level, Layers ( Sub grade, Sub base, Base coarse, Primer coat ), Portland Cement Concrete Pavement (PCCP).
Senior Site EngineerFull Time
Apr 2019 - May 2022 -3 yrs, 1 month
Egypt , Giza
- Job Details:Project: Palm Hills New Cairo | Feb 2019 - Jun 2021 Owner: Palm Hills Developments. Consultant: SHAKER Consultancy Group. Buildings and Villas Concrete Works: Excavations, Isolated and Raft Footings, Coloumns & Solid Slabs. Finishing Works: Masonry, Plaster, Handrails, Marbles, All isolation works, Ceramic, Aclyric, Louvers & MEP works.
Construction EngineerFull Time
Feb 2019 - Apr 2019 -2 months
Egypt , Giza
- Job Details:Villa in the standard model of the compound. Started by demolition works, concrete crushing, wall cutting, round stairs concrete crushing then open the slabs by core digging to build new concrete stairs 3 flights in the middle (Repair Works). then Digging and Excavation works to build new extension 500 m2 Plan surface repeated 5 floors from P.C. footing, R.C. footing, basement columns then flat slab ceiling repeated 5 times, footing isolation, backfill cut electrical works from the beginning and plumbing works too, all basement columns belted by concrete belt (omsan) and Cantilevers , Then Finishing works : Masonry, Plaster, Paints, Marbles, Wallpapers, GRC, GRP, HDF, Gypsum Board, MEP, Isolation, Futec, Wood Doors, Alum. Windows, Handrails, Ceramic, Stones, Elevator Works & Pool Utilities (All Finishing Works) According to Designs.
Consultant Civil EngineerFull Time
UDC 5+ ( Urban Development Consortium )
Nov 2018 - Feb 2019 -3 months
Education
Bachelor's Degree in Civil Engineering
Cairo University (CU)Jan 2012 - Jan 2017 - 5 yr
High School - Thanaweya Amma
Oboor Experimental Language SchoolJan 2012
Activities
Trainee Engineer at ECG
Student Activity
Aug 2015 - Sep 2015 -1 month
Trainee Engineer at ACE Mohram Bakhoum
Student Activity
Jul 2015 - Aug 2015 -1 month
Trainee Engineer at ACE Mohram Bakhoum
Student Activity
Jul 2014 - Aug 2014 -1 month
Achievements
Scouting
Skills
- Driving
- Scouting
- Structural Engineering
- Construction
- Microsoft Office
- Software Development
- Computer Skills
- Computer Programs
- Information Technology (IT)
- Software Engineering
View More
Languages
Arabic
FluentEnglish
FluentFrench
Beginner
Training & Certifications
PMP
PMI·2023Certified Cost Professional Certification CCP
Udemy·2023OSHA Safety
Orascom Construction·2023Architecture Finishing
CAD MASTERS·2020Architecture Finishing
CAD MASTERS·2020Concrete Diploma
Cad Masters·2019