EH

Ehab Hashem gamal el deen

Material Planning Engineer at Al-BABTAIN LIGHTING&POWER SOLUTIONS

6th of October, Giza, Egypt

Work Experience

  • Senior planning engineerFull Time

    Albabtain lighting & solution

    Apr 2024 - Present -1 yr, 3 months

    • Job Details:Issue master production planning Issue material planning schedule Issue pudget Make cost estimation Follow up production line
  • Mechanical Site EngineerFull Time

    El zahy group for general contracting

    Jan 2023 - Mar 2024 -1 yr, 2 months

    Egypt , Cairo

    • Job Details:Install lift water pump station Operation and maintenance lift water pump starion
  • Material Planning EngineerFull Time

    Al-BABTAIN LIGHTING&POWER SOLUTIONS

    Jan 2016 - Present -9 yrs, 6 months

    Egypt , Giza

    • Job Details:• Determine, analyze, and plan the required quantity of the packing materials then issue PR and communicate the schedule and the priorities of required items to the procurement department to meet the requirements of the production plan. • Make master production plan and determine the gap between the packing materials, the packing products and the workshop production level. • Analyze the market fluctuations to find alternative solutions and minimize the stock level and the order quantity. • Monitor stock levels and maintain optimum business level. • Follow up and control the delivery time of the purchasing material with the procurement • Follow up the deviations of materials consumption rate and take Corrective action. • Coordinate and expedite the flow of work and materials within or between departments according to daily and weekly production schedules
  • Production Planning EngineerFull Time

    Al-BABTAIN POWER&TELECOMMUNICATION

    Jan 2010 - Dec 2015 -5 yrs, 11 months

    Egypt , Giza

    • Job Details:• Prepare cutting lists production package based on shop drawings . Drawing in solid works sheet metal works like cable try and other accessories, flatten it and cutting it by plasma then make hole on it then bending it • Arrange loading of the factory for each project • Prepare master plan and production schedules. • Optimize utilization of material and free stock • Prepare programming for cnc machine • Monitor and follow up production progress and ensure completion of works within budgeted timing
  • Education

    • Bachelor's Degree in Mechanical power engineer

      Menoufia University

      Jan 2009 

    Achievements

    -Modify cutting process to use available material from stock and local market. - Reduce scrap percentage from 40% to 20%. -Coordinate with design department to modify deign drawings to use available material in stock and local market. -Modify material list to reduce scrap and increase the profit from 20% to 25%. -Suggest and modify in production process led to reduce consumables from 500,000 to 350,000 L.E per year .

    Skills

    • Steel Fabrication
    • Solidwoks
    • • Cost Control
    • • Planning projects
    • Engineering
    • Sheet Metal
    • ERP System
    • • CNC programmed
    • hvac systm
    • MRP
    View More

    Languages

    • English

      Advanced

    Training & Certifications

    • Logistics & Warehousing Course

      British international center·2017
    • Hvac course

      engineers syndicate·2014
    • Hydraulic circuit course

      integrated technical education cluster·2010
    • AutoCAD Course

      engineers syndicate·2009
    Share this Profile