EE
Ehab ElManharawy
Senior Process Engineer at Eni
Giza, EgyptWork Experience
Senior Process EngineerFull Time
Eni
Apr 2019 - Present -6 yrs, 3 months
- Job Details:Key projects and Roles: ANG Technology feasibility Study; Adsorption of Natural Gas Technology enables storage of natural gas at lower pressure and volumes. Accordingly, mobile vessels are used to fuel several selected remote sites. I developed the case study with focus on logistics, operability and energy efficiency. Petrobell Gas Plants HAZOP and SIL Recommendations closure. This project included over 150 recommendations to upgrade the relatively old Gas plant safety. I was responsible for organization of the recommendations along with the process activities such that relevant recommendations are grouped and categorized to ensure smooth workflow with respect to recommendations impacts on each other and shutdown plans. At the end of this project I prepared a paper about the management, organization and execution of such projects. I presented the paper in OMC (Oil and Gas Mediterranean Conference) and it was published on Eni’s library. Liverpool bay Carbon Capture: where I was supporting UK office. During this project I was exposed to CO2 dense phase handling. Damietta LNG Plant Debottlenecking study. This was a fast track project for studying the switch over between operating modes according to varying feed conditions. The project included a dynamic simulation to test online switch over then identify bottlenecks and propose solutions at the end. The model included all the LNG plant and by the end of such a complex project we earned the client’s technical confidence and the client signed a service agreement with our office and we are currently handling more jobs from DLNG side. Currently working on a Biogas Project in Port Saeed with the main role of vendors evaluation and review. Currently working with a water treatment systems supplier on a packaged containerized water treatment systems that are self-powered by renewable energy. Other Projects: Meleiha New Phase II Gas Plant Integration with Existing Oil Plant Iraq Fiscal Metering Systems Mahani 2 & 3 EPF Meleiha Landing Area Agiba Separation System Agiba new Desalters and Separator integration with Existing facilities Baltim South West Flowlines Algeria WellHeads
Senior Process EngineerFull Time
Onspec Tawakol
Oct 2015 - Jan 2019 -3 yrs, 3 months
Egypt , Cairo
- Job Details:Key Projects and Roles WASCO CPF HAZOP and SIL Recommendations closure. This project included over 190 recommendations to upgrade the relatively old Gas plant safety. I was responsible for organization of the recommendations along with the process activities such that relevant recommendations are grouped and categorized to ensure smooth workflow with respect to recommendations impacts on each other and shutdown plans. I was responsible for the summer training for university students. Also, I was the one who prepared the training program for chemical engineers. Other Projects PETROZNIMA , MUZHIL Field Development Project, MOPU, Early Production Facilities WASCO Wellhead Gathering Manifold Tie-ins Agiba Flare System Upgrade Engineering Works for EBGDCO Plant Tie-in with SUCO and GPC Pipelines Amapetco -Engineering Work of the Pilot Gas Lift Detailed Engineering Works for LPG and Vapor Recovery Pipelines between LPG Terminal and Oil Terminal in Aqaba West Bakr - Water Injection System Verification Tanmia/BAPETCO - Engineering Works for SITRA Early Production Facility Amapetco (Production Water Handling Study at Amapetco GOSP) Petrosannan-Engineering Review for HG Rental Facilities WASCO, Detailed Engineering Works for Faraskour Phase II Compression Station
Senior Process EngineerFull Time
ODE
Jun 2015 - Sep 2015 -3 months
Egypt , Cairo
- Job Details:Projects as Lead Process Engineer: 1- Hyatt Water Disposal System for Khalda Petroleum Co. 2- AlSalam Ground Flare for Khalda Petroleum Co. 3- Green Field De-bottlenecking for Khalda Petroleum Co.
Process EngineerFull Time
Mustang Wood Group
Apr 2014 - May 2015 -1 yr, 1 month
Saudi Arabia
- Job Details:Key Projects and Roles: PetroRabigh Refinery Debottlenecking to Process 400 MBD net, during summer. This was a study I developed to debottleneck the reduced cooling duty of the main crude distillation tower overhead condenser. The study aimed to optimize the flow distribution in the air coolers to maximize its efficiency. Other Projects SATORP Storage, Mixing and Export system for Jubail Bulk Plant. Customer, Saudi Aramco Jubail Bulk Plant. Customer, Saudi Aramco
Education
Bachelor of Chemical Engineering in Chemical Engineering
Cairo University (CU)Jan 2002 - Jan 2007 - 5 yr