EN

ELSAYED NOURELDIN

Hill International, Inc.

Abu Dhabi, United Arab Emirates

Work Experience

  • Construction Manager

    Hill International, Inc.

    Apr 2014 - Jun 2019 -5 yrs, 2 months

    • Job Details:April 2014 - June 2019 (5 years 3 months) , UAE- ABU DHABI , Hill International - , Area Manager- Aviation , MTC’s Mid-Field Abu Dhabi International Airport , . The Abu Dhabi International Airport Midfield Terminal Complex (MTC) is , being constructed to cope with increasing passenger traffic , "The MTC is located between the airports two runways, which also gives" , the terminal its name. The new complex will provide a full terminal building, , passenger and cargo facilities, and duty free shops and restaurants for a , total capacity of 27-40 million people a year. Piers will accommodate up to , 65 aircraft, including the Airbus A-380. 49 Gate Houses and 106 Passenger , Boarding Bridges. Baggage Belt is over 28 km and Baggage Delivery Time is , 15-20 mints. 150 Check in counters and First and Business Class dedicated , Check in and Lounges Page 1 of 4 , "The MTC terminal building will be one of the regions largest and most" , architecturally iconic structures. It will be 742,000 square meters in size. The , central space of the terminal building will be large enough to hold three full- , sized football pitches while the check-in hall features a ceiling 52 meters tall at , its highest point. 74,000 t of Steel Structure with Roof Span is 319 m at widest , point. 672,000 m3 of concrete, 23,000 External glazing panels, it will be with , Total cooling load 146MW by 309 AHUs and with connected load 115 MW by , (22KV) 36 Substations The complex will include up to 31,384 square meters , of retail and food and beverage outlets. These are set around a 1,000 square , meter indoor garden, another first for the region, which will host a wide variety , of landscapes and species from region and beyond.
  • Construction Manager, Fit out

    Hill International, Inc.

    Nov 2010 - Mar 2014 -3 yrs, 4 months

    • Job Details:November 2010 - March 2014 (3 years 5 months) , Gate Towers, Reem Island, ABUDHABI , Hill International - , Construction Manager, Fit out , Abu-Dhabi, UAE. Gate District Towers , \uf0a7 The Gate District Towers 3-8 project located in Shams Abu Dhabi at Al , Reem Island forms an integral part of The Development on Reem Island , which is a landmark development within Abu Dhabi and the United Arab , Emirates. On completion, the project will provide an outstanding lifestyle , environment and a sustainable development, offering places for people to live, , work, and enjoy recreation and leisure activities. The project is a mixed-use , development and involves construction of 6 towers including four residential , towers (Tower 3,4,5 & 7), one office tower (Tower 6) and one Hotel/Serviced , apartments tower (Tower 8) on a podium underneath all towers, the podium , accommodates retail, leisure, civic amenities, parking, building services, etc. , The project includes a pedestrian Link Bridge between the podium towers 1 & , 2 and towers 7 & 8 podium and an Amenities Bridge linking towers 3, 4, 5 &7 , Including scope of Landscaping package including soft and hard scape, , interface with the main building on ground level and above podium areas, and , ensure all activities are within project schedule and within C& E plan. , o Soft scape ( planting including palms, trees , building ground covers & , climbers ) , o Pathways , shades of children’s playground areas, plaza , trellis, fountains , o Benches , bins , o Rubber children’s play areas, with shade , o Swimming pool with stamped concrete and wooden bridge , o Pumps rooms and irrigation system ( pop-up spray, drip or bubbler ) Page 2 of 4 , o Egress road pavements, wayfinding. , o Drainage system and drainage paths under walkways
  • Senior Project Engineer

    QP International

    Aug 2007 - Oct 2010 -3 yrs, 2 months

    • Job Details:August 2007 - October 2010 (3 years 3 months) , Sky @ Sun Towers , Reem Island, ABUDHABI , QP International - , Project Architectural Finishing Engineer, , Abu-Dhabi, UAE. Sky & Sun Towers , Shams Abu Dhabi on Al Reem Island is a landmark development within Abu , Dhabi and the UAE. Close to the city yet offering a self-contained community, , Shams Abu Dhabi will offer 55,000 residents a lush green island setting. , Located a few hundred meters northeast of Abu Dhabi, Shams Abu Dhabi , offers spectacular views of the Arabian Gulf and Abu Dhabi city. The Sky , Tower, at 74 stories (300 meters) and The Sun Tower, at 64 stories (258 , meters) high will be amongst the tallest buildings in Abu Dhabi and are part of , the Gate District of Shams Abu Dhabi. The Towers will house 1,400 residential , and commercial units. Recreational facilities including swimming pools, tennis , courts and sports and fitness centers, restaurants, coffee shops as well as a , shopping mall with major outlets will also be a part of the development. The , Towers offer a unique combination of facilities that will enable it to support all , the essential needs of the community. This distinguishes it from other major , projects in the region. , Including Managing of Landscaping package including soft and hard scape , and interface with the main building to ensure there is no clash or delay with , landscape activities within main schedule of the project and all items are , completed within C&E plan as the following , "walk ways, childrens playground and shades, rubbered tennis court with" , fencing , soft scape and irrigation system , palms, trees, shrubs and building , ground covers and swimming pool, lap pool and infinity pool , mist fountain , , "landscape furnitures"
  • Senior Project Engineer

    SEIDCO General Contracting Co. Dubai, UAE

    Feb 2002 - Jun 2007 -5 yrs, 4 months

    • Job Details:February 2002 - June 2007 (5 years 5 months) , Shorline, Palm Jumeriah, Dubai , February 2002 – June 2007 Page 3 of 4 , SEIDCO General Contracting Co. Dubai, UAE , Senior Project Engineer , Shoreline Apartments, Palm Jumeirah, Dubai , The Palm Jumeirah is a high profile project consisting of a palm shaped , artificial island, located within the Dubai coastline, with an estimated overall , value of $ 6.75 billion. The 20 Shoreline Apartment buildings that line the , east side of The Trunk feature some of the Middle East’s most desirable , apartments. Five exclusive beachfront clubhouses cater to residents, providing , world class fitness centers, retail outlets, al fresco dining, swimming pools and , direct access to the island’s white sand beaches.
  • Skills

    • AutoCAD
    • a bridge at 10th of ramadan bridge
    • Civil Engineering
    Share this Profile