CA
Christiane Abou El Kheir
Contracts Administration Team Leader (Tendering Department) at Orascom Construction
Heliopolis, Cairo, EgyptWork Experience
Contracts Administration Team Leader (Tendering Department)Full Time
Orascom Construction
Jan 2018 - Present -7 yrs, 6 months
Egypt , Cairo
- Job Details:• Participating in the preparation of the following Contracts documents (Arabic, English & French Contracts): - Contract Summary for a Project. - Cash flow analysis - Risk analysis - Insurance calculations - Bonds Calculations - Detailed Contractual Observations for the Project. - Escalation and inflation analysis - Negotiating the Contract with the Client • Participating in Projects’ negotiation. • Coordinating between OC and our partners in the Tendering stage regarding all contractual and commercial issues. • Preparing of Agreements (Subcontracts, Consultancy, MOU, Joint Venture & Consortium Agreements) • Supervising and leading a team Projects: • Central Bank of Egypt – Menya Branch – Egypt • EHC Ammonia Plant – Egypt • El Hammam Water Desalination Plant - Egypt • Sea Water Desalination Plant – Skikda, Algeria. • Renewal, modification and maintenance of tracks of Giza-Bennisuef – Egypt. • 500 KTA Polymer Grade Propylene Plant – SIDPEC. • El Shatrah Hospital – Iraq. • Mansheyet El Horreya Waste Water Treatment Plant – Egypt. • Libreville Airport – Gabon. • Basra Metro – Iraq.
Senior Contracts Administrator (Tendering Department)Full Time
Orascom Construction
Jan 2016 - Jan 2018 -2 yrs
- Job Details:• Participating in the preparation of the following Contracts documents: - Contract Summary for a Project. - Cash flow analysis - Risk analysis - Insurance calculations - Detailed Contractual Observations for the Project. - Letter of Guarantee requested in the Contracts documents - Escalation and inflation analysis • Participating in Projects’ negotiation. • Coordinating between OC and our partners in the Tendering stage regarding all contractual and commercial issues. • Preparing of Agreements (Subcontracts, Consultancy, MOU, Joint Venture & Consortium Agreements) Projects: • Marassi BP# 112 - Egypt • Aramco relocate residential compounds – KSA. • Jewel of The Creek (JOC) - Dubai - United Arab Emirates. • Construction and maintenance of roads, bridges, storm water drainage, sewer and other services – Kuwait • Cairo Metro Line 4 (Package 401) - Egypt • SWRO Water Treatment Plant – Jebel Ali • Port of Sokhna Container Terminal Basin 2 - Egypt • El Fujairah International Airport - United Arab Emirates. • Renovation & Extension of Mansheyet El Horreya WWTP - Egypt
Senior EstimatorFull Time
Orascom Construction
Apr 2010 - Dec 2015 -5 yrs, 8 months
Egypt , Cairo
- Job Details:• Participating in implementing the policies and procedures applicable to the Section. • Reviewing project specifications and Bill of Quantities against drawings to ensure accuracy of all estimates produced. • Reviewing the quantity surveying and quantity take off from drawings. • Evaluating vendor quotations against tender specifications to include in the tender documentation. • Preparing and Review the technical and commercial comparison sheets for the suppliers offer. • Preparing estimates of probable costs of materials, labor and equipment for construction projects based on drawings and specifications using current quotations, and historical information for. • Preparing estimates by assembling product requirements through coordinating with all teams; Quantity survey, Arch & Civil, Electro-mechanical, and Contracts, in order to get all the data needed for calculating costs, applying margins to ensure that estimates addresses all potential safety risks and concerns. • Submitting commercial and technical offer during the bid. Projects: • Alexandria University Hospital – Smouha. • Cairo Airport Development Project – TB2. • Credit Agricol Egypt Head Quarters Office Complex Project. • Accor – NSGB Complex - Tahrir Square. • Gulsan Egypt New Factory – 6th of October city. • El Maabar Mixed Use Development (St. Regis Hotel – Amman, Jordan) • British Petroleum - Iraq NV – Rumaila. • Mars Egypt Site Development Project. • New Dar El Fouad Hospital: Architectural / MEP Package – Nasr City. • Exxon Mobil M045 - FOD Campus for South Oil Co, West Quarna, Southern Iraq. • Exxon Mobil M090 - Design & Construction of DS7 Central Support. Facilities for South Oil Co., West Quarna 1, Southern Iraq. • Golden Domes Hotel and Mall – Dar el Eshara. • El Salam El Katameya Hospital. • Marassi Package 85 • Sharm El Sheikh Airport
Procurement EngineerFull Time
Orascom Construction
Dec 2007 - Mar 2010 -2 yrs, 3 months
Egypt , Cairo
- Job Details:• Studying project tender drawings, specifications and related documents. • Reviewing tender proposal technical and financial documents. • Reviewing quotations from local and overseas suppliers against specifications. • Negotiate with vendors to obtain optimum quality, cost, terms etc. • Preparing both technical and financial comparisons against specifications before submitting the package to the consultant. • Preparing submittal, or re-submittal for consultant’s approval in line with the selected vendor. • Reviewing contracts/purchase orders issued by our procurement department in the head office according to approved submittal. • Following up & expediting the start of work/delivery date of material with sub-contractors/suppliers according to the time schedule. • Inspecting the delivered material to site according to the approved submittal.
Education
Bachelor's Degree in Architecture
Helwan UniversityJan 2007
High School - Thanaweya Amma
sacre cœur heliopolisJan 2002
Skills
Languages
English
FluentArabic
FluentFrench
Fluent
Training & Certifications
PMP
Project Management Institute·2013Projects feasibility studies
American University in Cairo·2009Project Planning and control techniques
American University in Cairo·2009Management of Project Resources
American University in Cairo·2009Primavera
Oracle·2007AutoCAD 3-D
AutoDesk·2007AutoCAD 2-D
AUTODESK·2007