BF

Baher Abdul Wanees Telb Farag

Lead Team Electrical Engineer at Egyptian Maintenance Company

Ameria, Alexandria, Egypt

Work Experience

  • Lead Team Electrical EngineerFull Time

    Egyptian Maintenance Company

    Nov 2016 - Present -8 yrs, 8 months

    Egypt , Alexandria

    • Job Details:WND Gas Development -Giza/Fayoum Facility, British Petroleum Co. / Bechtel / EMC, Alexandria-Egypt -Perform method of statements, ITPs, & initial test reports and procedures for testing & inspection -Prepare the manpower, tools, calibrated & approved testers, and equipments for the required tests -Update the punch list before preservation process as asset refurbishment for the gas facility -Preparation of the final reports by updated documents and as built drawings
  • Electrical Field EngineerFull Time

    Petroleum Projects & Technical Consultations Co. (Petrojet) through First Company

    Nov 2014 - Sep 2016 -1 yr, 10 months

    Egypt , Alexandria

    • Job Details:Petrochemicals Complex-Polyethylene Plant, ETHYDCO / TOYO & ENPPI / Petrojet / First, Alexandria-Egypt -Determine manpower, tools, equipment, and material requirements for electrical craft -Monitor actual work performance compared to the project budget and schedule -Ensure the most current design documentation is being utilized to complete activities -Plan and coordinate the execution of all electrical related works with mechanical and civil groups -Provide leadership for the safety and accident prevention on the project -Review work accomplished, report quantities, and inspection installation quality
  • Section Head Electrical EngineerFull Time

    Alexandria Fiber Co. (AFCO)-(Aditya Birla group)

    Jul 2008 - Oct 2014 -6 yrs, 3 months

    Egypt , Alexandria

    • Job Details:Alexandria Fiber Co., Alexandria-Egypt -Prepare and apply of preventative maintenance programs and check lists for critical loads performance -Provide leadership, technical expertise in all areas related to the plant's electrical systems -Assist in the management of the day to day workload for the planning and resourcing of Planned Preventative Maintenance (PPM), maintenance shutdown, and spare parts taking in to consideration of cost and budge -Assist with maintenance planning and execution of major equipment repairs and unit turnarounds -Witness test the proving and commissioning procedures of final installation till handover to operation -Coordinate and supervise work of contractors -Perform root cause analysis and resolve problems and train the down team
  • Electrical EngineerFull Time

    First for contracting and supply

    Mar 2007 - Jul 2008 -1 yr, 4 months

    Egypt , Alexandria

    • Job Details:Qasr Gas development -Obayied Facility, Khalda Petroleum Co., Petrojet / First, Alexandria-Egypt -Review the works at site and done in accordance with the AFC drawings, project specs, and quality -Prepare and assign the resources such as manpower, materials, and tools required for execution & tests -Submit site daily reports on regular basis -Update the punch list to clear the critical items before energizing -Participate in tests & Commissioning activities with vendors
  • Education

    • B.Sc. Engineering in Electrical (Power & Machines)

      Menoufia University

      Jan 2000 - Jan 2005 - 5 yr

    Skills

    Languages

    • Arabic

      Fluent
    • English

      Advanced

    Training & Certifications

    • Reliability Centered Maintenance (RCM)

      Alexandria Fiber Co. (AFCO)-(Aditya Birla group)·2013
    • Electrical installations in hazardous areas

      OGS company at Petroleum Complex-Alexandria branch·2013
    • Basic Condition Equipment (BCE) & Maintenance Audit for Workshop

      Alexandria Fiber Co. (AFCO)-(Aditya Birla group)·2012
    Share this Profile