AA

Ahmed Askar

Project Manager

Rehab City, Cairo, Egypt

Work Experience

  • Project ManagerFull Time

    Protec Group

    Apr 2022 - Jun 2023 -1 yr, 2 months

    Egypt

    • Project ManagerFull Time

      ARKMEN Technology

      Aug 2019 - Aug 2021 -2 yrs

      Egypt , Cairo

      • PMFull Time

        Kahromecha - Misr For Mechanical & Electrical Projects

        Feb 2019 - Jun 2019 -4 months

        Egypt , Cairo

        • Mep Construction ManagerFull Time

          Plafond

          Mar 2015 - Nov 2018 -3 yrs, 8 months

          United Arab Emirates , Dubai

          • Job Details:* Review and Follow up Contract / Project Milestone, and coordinate with related parties to finish the activities in time. * Responsible for the Engineering quality, workmanship and effective execution of the part of the project in accordance with the set timelines and budget. * Ensure that the project attains/better the specified and agreed standards in accordance with Company’s Quality Standard Procedures. * Assist the Project Manager in delivering the project to the specified quality, on time and within the budget. * Prepare and maintain the Materials Submittal Flow Sheet. * Obtain quotation from suppliers. Evaluate offers and prepare comparative statements. * Prepare and maintain the Shop Drawing Flow Sheet. * Provide Engineering inputs and support to the Draughtsman in the preparation of the Shop Drawings. * Check, review and approve Shop Drawings. * Review comments received from the consultant on Material Submittals and Shop Drawings. Prepare and organize re-submittals as required. * Take –off material quantities from the approved drawings and prepare the Material requisition. * Plan labour requirements based on the construction program and provide requirements to the Project Manager. * Submit and obtain approvals from relevant authorities’ * Attend schedule meetings as advised by the Project Manager with other parties i.e. Client, Consultant, Main Contactor, Authorities etc. * Plan, prepare and document Testing and Commissioning plan and supervise all related commissioning activities. * Rectify and complete Snags prior to Final Handover. * Responsible for monitoring, guiding and evaluating Site Engineers, Foremen and Supervisory staff. * Responsible for, in co-ordination with the site Engineers, Supervisors and foreman, work allocation and execution on a daily basis. * Review and monitor monthly labour performance and utilization against the planned targets.
        • Education

          • Bachelor's Degree in Electrical Engineering

            Higher Technological Institute (HTI)

            Jan 2005 

          Achievements

           ADCO/Petrofac onshore Asab oil field (11kv Substations & ELV) CDS Buildings (Substations 1,2&3- Control building-Service building – Gate-house -RDS-6)  ADSSC/NBHH Contract NO. O-1537 – Al Ain Enhancement Scheme, construction of Trunk sewerage & TSE Infrastructure-Part 2 (PLC\RTU systems and fiberoptics system)  ADAC/TWF Al Bateen Executive Airport Electrical and ELV systems (Estidama pearl 3 building)  ADAC/ETIHAD Abu Dhabi Airport Cargo CT1,CT2 & CT3 refurbishment MEP works  Jumeirah/ POCO LOCO– JBR Dubai-MEP  Jumeirah/ POTS and PAN Board– JBR Dubai-MEP  Etihad AW/Jones The Grocer at Eihad Head quarter-MEP  Dubai HQ Biotech @DSP Al Barsha Dubai (2B+G+20)

          Skills

          • Project Management
          • MEP
          • Network Infrastructure
          • Electrical Engineering
          • Low Current Systems (LC)

          Languages

          • English

            Fluent

          Training & Certifications

          • Fiber-optics fundamentals

            CORNING INSTITUTE·2006
          Share this Profile