AM
Abdul Haseeb Mohammed
Sr. Mechanical Engineer Technical at Marine Building Landmark
Riyadh, Saudi ArabiaWork Experience
Sr. Mechanical Engineer TechnicalFull Time
Marine Building Landmark
Feb 2024 - Present -1 yr, 3 months
Saudi Arabia , Riyadh
- Job Details:• Oversaw the execution of Mechanical and Electrical technical site activities • Communicated regularly with design consultants to ensure alignment with project drawings, calculations, and variations. • Design and drawing of A/C according to project specifications and preparation of duct layout with supply and return diffusers, duct grill, slot diffusers with flexible connection. • Cooling load calculation, CFM calculation and Air distribution to various branches of duct. • Selection of FCU with reference to project specification required in Room/Hall. • Static pressure calculation for selection of AHU. • GPM calculation and distribution of chilled water to various FCU and AHU through chilled water supply and return pipe. • Take onboard client feedback and react promptly with design improvements. • Plumbing design calculation according to client requirements with reference to standards. • Firefighting design Calculation as per NFPA standards and Manufactures recommendation. • Supervised and coordinated with consultant engineers across multiple disciplines. • Monitored progress according to project schedule. • Ensured materials and work specifications were met, aligning plans with contractors. • Provided ongoing quality control and timeline management throughout project implementation. • Approved work in compliance with specifications and plans for seamless progression. • Addressed technical issues in collaboration with designers and facilitated communication among team members.
Lead Mechanical QC EngineerFull Time
Al Fayhaa Construction and Contracting
Mar 2021 - Jan 2024 -2 yrs, 10 months
Saudi Arabia , Riyadh
- Job Details:• Conducted issuance of inspection reports and coordinated client inspections. • Reviewed method statements for equipment installation. • Reviewed inspection and test plans, inspection checklists, and work instructions to align with project requirements and ISO 9001:2015 Quality System. • Ensured implementation of quality inspection plan (QIP). • Reviewed Test packages and witnessed Pneumatic Testing, Hydro Testing, and Flushing. • Analyzed Mechanical drawings, materials, schedules/program of works for HVAC, Plumbing, and Fire Fighting Systems. • Design and drawing of A/C according to project specifications and preparation of duct layout with supply and return diffusers, duct grill, slot diffusers with flexible connection. • Cooling load calculation, CFM calculation and Air distribution to various branches of duct. • Selection of FCU with reference to project specification required in Room/Hall. • Inspected Stationary and Rotatory equipment, ensuring leveling alignments. • Conducted physical inspection of equipment. • Supervised and inspected Copper Brazing Pipe for HVAC System. • Inspected soft foot for motor and maintained shims and shaft alignment. • Inspected vertical and horizontal pumps for physical and axial/radial alignment. • Coordinated site activities to ensure compliance with project specifications, related Codes, and Standards. • Inspected incoming materials in accordance with specified requirements and standards. • Monitored and reviewed hydro testing processes. • Oversaw hydro testing activities for underground piping using manual and digital recording methods. • Conducted installation of Fire Fighting System, Drainage System, and Storm Water Drainage. • Oversaw Installation of FRP manholes and Inspection Chambers to ensure compliance with standards and project specifications. • Conducted installation of Valves and Fittings as per project requirements. • Installed and checked the functionality of back flow preventers, irrigation water piping, fire hydrants, cooling pipes, gas pipes, duct installation, air balancing of HVAC system, and Leak Testing of Drainage Network. • Conducted Testing and Commissioning of Firefighting Pump Stations according to NFPA standards and Civil Defense acceptance. • Managed Testing and Commissioning of Irrigation Pump Stations according to ASME standards. • Inspected Testing and Commissioning of FM-200, Firefighting Network components (Alarm Check Valve, Zone Control Valve, Pressure Regulating Valve). • Reviewed Mechanical Equipment Operation and Maintenance Manuals. • Witnessed inspections for electrical, instrument, telecom, and control room installations, including cable installation, tray works, cable lying and termination, and instrument cable meagering and continuity testing.
QC Mechanical EngineerFull Time
Al Latifia Trading and Contracting
Dec 2019 - Feb 2020 -2 months
Saudi Arabia , Riyadh
- Job Details:• Reviewed drawings, documents, and material inspection records • Checked piping layouts and interdisciplinary drawings/documents • Implemented and monitored project quality plan requirements to ensure compliance • Design and drawing of A/C according to project specifications and preparation of duct layout with supply and return diffusers, duct grill, slot diffusers with flexible connection. • Cooling load calculation, CFM calculation and Air distribution to various branches of duct. • Selection of FCU with reference to project specification required in Room/Hall. • Supervised duct fabrication works and coordinated with production to schedule timely inspections • Monitored and inspected fit-up, root-run, and subsequent passes for pipe joints during fabrication • Conducted daily inspections and prepared reports for construction piping/welding work, pressure testing, and releasing of fabricated pipelines • Created inspection checklists and conducted inspections • Ensured safety and compliance standards were maintained by workers • Managed scope creep to avoid project delays • Installed, tested, and commissioned 8 Trane Air Cooled Chillers, 16 Trane CRAH Units, 8 CWH S pumps, 8 CHW R pumps, 3 GENSET Diesel Generators (2000 kVA each), 8 KONE Elevators, and Fire Water Mist System • Facilitated approvals of all necessary documentation and inspection formats with stakeholders • Inspected soft foot for motors and maintained shims and shaft alignment • Tested, adjusted, balanced, and commissioned HVAC systems according to NEBB standards • Maintained and updated quality-related records/documents to ensure successful handover to the client. • Conduct onsite inspections to identify and implement preventive and corrective actions • Provide technical guidance and clarifications to technicians • Witness inspection of electrical and instrument activities, including installation of cables, tray works, cable laying and termination, instrumentation cable testing, and continuity testing • Ensure compliance with industry standards and guidelines for electrical, telecom, and control room installations
Education
Bachelor's Degree in Mechanical Engineering
Jawaharlal Nehru Technology UniversityJan 2017
Languages
English
FluentHindi
AdvancedArabic
IntermediateUrdu
Intermediate