profile-img

Tarek Ebrahim Elazab

Technical Office Manager at MZECH Medhat Abo Zaed Egyptian Consulting home

Fleming, Alexandria, Egypt

Work Experience

  • Technical Office ManagerFull Time

    MZECH Medhat Abo Zaed Egyptian Consulting home

    Sep 2016 - Present -8 yrs, 9 months

    Egypt , Alexandria

    • Job Details:Project contains Main and service tunnels. Chilled, domestic and irrigation water tanks. 4 Buildings as substations. 4 Faculties Of Engineering. Administration building. Center of excellence building. Library building. Service building. 4 Lecture halls. Infra structures. Landscape. Main gate, 5smal gates and fence.
  • Technical Office ManagerFull Time

    SAUDI BINLADIN GROUP (S.B.G.)

    Sep 2008 - Aug 2015 -6 yrs, 11 months

    Saudi Arabia , Makkah

    • Job Details:Working in the central utility complex (CUC) of the third holly haram expansion, the project contains the new chillers, water tank, generators plant, fire pump station, central waste handling plant & utility tunnel of the new expansion. As part of the technical office we try to provide a simple but effective system for controlling the work on the project, it’s basis is the planing in advance of all activities and records to be kept, agreed and up to date with all concerned parties before commencement of associated activities to follow up with project schedule and scoop.
  • Technical Office ManagerFull Time

    Behera Sharing Campany

    Jun 2001 - Aug 2008 -7 yrs, 2 months

    Egypt , Aswan

    • Job Details:great project to irrigate 500000 acres At Toshki area
  • Site Manager/construction ManagerFull Time

    Behera Sharing Company

    Jun 1999 - Jun 2001 -2 yrs

    Egypt , Alexandria

    • Job Details:Infrastructures (Agamy area at Alexandrea)
  • Education

    • Bachelor's Degree in Architecture & interior design

      Arab Academy for Science, Technology and Maritime Transport (AAST)

      Jan 2017 

    Achievements

    Egypt – Japan university of since and technology. Central utility complex (CUC) of the third holly haram expansion. Jabal Omar project. Irrigate 500000 acres At Toshki area. Infrastructures (Agamy area at Alexandria). Develop areas served by great river in state of Libya. Participate in studies for pre-qualification to realize atomic energy (Candu 6 El DABAA Unit 1 ) . Waves break down barriers total length 3km (Northern coast–Marina village). Infrastructures (Asafra and Mandra at Alexandria).

    Skills

    • Architecture
    • Interior Design
    • photo shop
    • 3d max
    • Auto cad
    • Autodesk Revit

    Languages

    • English

      Fluent
    Share this Profile