profile-img

Ehab kamel Gadalla

Electrical engineer

Monufya, Egypt

Work Experience

  • Electrical engineerFull Time

    Consukorra contracting company

    Sep 2016 - Apr 2017 -7 months

    Egypt , Giza

    • Electrical site EngineerFull Time

      BIN SAMMAR Contracting Company

      May 2010 - Jun 2016 -6 yrs, 1 month

      Saudi Arabia , Riyadh

      • Job Details:Electrical Jobs: • Low voltage networks & medium voltage networks. • Lighting systems. • Telephone systems. • CCTV systems. • Fire alarm systems. • Sound systems. • Design & implementation of S.L.D. • Design & implementation of P&I Diagram. • Control networks with Schneider PLCs. . • Automatic Control Systems (SCADA SYSTEM). • Motor Starting Methods (star-delta, soft starter, Variable frequency Drive) . • Fiber optics network. • Street Lighting. • Lightning Protection Responsibilities included:- • Verifying the drawings B.O.Q & Specifications. • Submitting shop drawings, Materials for consultants, client's approval. • Preparing weekly, Monthly, programs. • Executing the work. • Inspecting Quality of work. • Controlling costs. • Attending weekly progress meetings with consultants & clients. • Preparing sub contractor’s bill.
    • Maintenance & Operation EngineerFull Time

      Mechanical Construction Engineers Company (M.C.E.co).

      Aug 2009 - May 2010 -9 months

      Egypt , Cairo

      • Job Details:Maintenance & Operation Engineer *Kafr Saad sewage water treatment Station, Damietta. *Kafr Al Zyat sewage water treatment Station , ALgharbia
    • Education

      • Industrial Electronics and Control Engineering, in Electrical Engineering

        Faculty of Electronic Engineering

        Jan 2004 - Jan 2009 - 5 yr

      • High School - Thanaweya Amma

        shentenal el hager

        Jan 2004 

      Achievements

      Projects - AL Makhram Central Water pumping station with 200,000 m3 capacity Electro-mechanical installations with (5 MVA) Electrical Power. - Central Water Supply Project for Tabuk And Other Coastal Cities and Towns Contract # 4 (three pumping stations with 3000 m3 capacity for each station) Electro-mechanical installations with (3 MVA) Electrical Power. - (Araer, Bedwa, Ayash & Alghoraba ) Dams Water Refinement Stations with 2000 m3 capacity for each station. Electro-mechanical installations with (1 MVA) Electrical Power..

      Skills

      • AutoCAD
      • Microsoft Office
      • Constructions
      • Water / Seawater & Wastewater Treatment Plant
      • Dailux
      • Ecodial

      Languages

      • English

        Intermediate

      Training & Certifications

      • electricity distribution networks

        Delta company of electricity·2007
      Share this Profile