
KARIM EMAM MAMDOUH
Electrical Engineer, Electrical Design, Power System Analysis
Nozha, Cairo, EgyptWork Experience
Secondary Design Team LeaderFull Time
MADKOUR EPC
Dec 2016 - Present -8 yrs, 9 months
Egypt , Cairo
- Job Details:1- Create / Review Overall Single Line Diagram for Substation. 2. Create / Review AC/DC Single Line Diagrams. 3. Create / Review HV & MV Cables Sizing Calculation. 4. Create / Review LV AC/DC Cables Sizing Calculation. 5. Create / Review Auxiliary Transformers sizing calculation. 6. Create / Review Zigzag Transformers sizing calculation. 7. Create / Review 220VDC Battery and Battery Charger sizing calculation. 8. Create ETAP Module for Substation to check all sizing calculation in the substation like Voltage drop study and short circuit/fault study. 9. Create Thermal study by ETAP software for Underground Cables (Direct buried or Ducts). 10. Review all RFQ’s for our scope equipment’s Like (GIS, Power Transformer, MV/LV Cables, Capacitor Banks, Auxiliary and Zigzag Transformers, AC/Dc Panels ... etc.). 11. Review all offers from all suppliers for our scope equipment’s like (GIS, Power Transformer, MV/LV Cables, Capacitor Banks, Auxiliary and Zigzag Transformers, AC/Dc Panels ……. etc.). 12. Review all PO’s for our scope equipment’s like (GIS, Power Transformer, MV/LV Cables, Capacitor Banks, Auxiliary and Zigzag Transformers, AC/Dc Panels ... etc.). 13. Review all submittal material for our scope equipment’s Like (GIS, Power Transformer, MV/LV. Cables, Capacitor Banks, Auxiliary and Zigzag Transformers, AC/Dc Panels ... etc.). Projects Executed : 1. Beni Suef 220/11 kV GIS SS. 2. Future Egypt SS1&SS2. 3. Al Galala 220/22/22 kV GIS SS. 4. Al Galala MV Network. 5. PV Sharm El-Sheikh Project. 6. Conference Hall Project. 7. NEW Capital SS2. 8. NEW Capital SS3. 9. AL GALALA University. 10. Egyptian Cement 66/22 kV GIS SS. 11. AL QAWMYIA 66/22 kV GIS SS. 12. Al GALALA Marble 220/22/22 kV GIS SS. 13. NEW CAPITAL – R2
Electrical Sales LeadFull Time
- Job Details:Work as Electrical Sales Engineer in Projects Department and responsible for all lighting Products
Electrical Engineer (Team Leader)Full Time
Wahah Electric Supply Company of Saudi Arabia (WESCOSA).
Dec 2010 - Jan 2016 -5 yrs, 1 month
Saudi Arabia , Dammam
- Job Details:1- My Duties in Technical and Engineering Side: Performing Technical studies as first I study all my projects RFQs and also make all the quotations for all my projects and after any project have Purchase Order (PO) I started to work the technical side also which are power system studies by using ETAP Software for industrial networks including: Load Flow, Short Circuit, All Protection Devices and Relays Coordination and Setting, Arc Flash and Motor Starting, All project has to performed according to the below phases; A.DATA COLLECTION AND VERIFICATION For All Drawings And Equipments. B.ELECTRICAL SYSTEM MODELING. C.ELECTRICAL SYSTEM STUDIES. . EXECUTED PROJECTS 1- Many Projects to SAUDI ARAMCO Company (Ras Tanura, Dhahran Plant, WASEA BULK PLANT, SAFANIAH, BERRI,JEDDAH REFINERY,.etc). 2- Many Projects to SABIC Company. 3- Many Projects to other sub Contractors Company Such as ( KENTZ, NESMA, MAADEN, MASCO, BABCOCK, ENPPI, AL LOJAM) 2- My Duties in Sales Side: Prepare Quotations For: Testing & Pre-Commissioning of all electrical Equipment for low and medium voltage Switchgear and MCC, Bus Duct, Cable Bus, Control panels, RMU, Power & distribution transformers and it’s measuring instrument for all companies according to ARAMCO Requirements or SCECO or SABIC Requirements. - Modification study for MV, LV Switchgear & MCC. - Electrical Specification study of ARAMCO, SCECO & SABIC. - Power System Analysis & Relay Coordination Study and Setting by using ETAP Software
Electrical Power System EngineerFull Time
- Job Details:Performing power system studies by using ETAP Software for industrial networks including Load Flow, Short Circuit, Protection and Relay Coordination, Arc Flash, Motor Starting, And Harmonic Analysis,. All project has to performed according to the below phases; A.DATA COLLECTION AND VERIFICATION. B.ELECTRICAL SYSTEM MODELING. C.ELECTRICAL SYSTEM STUDIES. EXECUTED PROJECTS 1-Gulf Petrochemical Industries Company. ‘GPIC’ in Bahrain. 2-Yanbu National Petrochemical Company ‘YANSAB’ in Saudi Arabia. 3-Saudi Kayan in Jubail Industrial City - Saudi Arabia.
Education
Bsc in Electrical Power and Machines Department
Benha UniversityJan 2005 - Jan 2009 - 4 yr
High School - Thanaweya Amma
Ismail Elkabany Secondary SchoolJan 2005
Achievements
Swimming
Skills
Languages
Arabic
FluentEnglish
FluentDutch
Intermediate
Training & Certifications
IPMA
PMI·2020ETAP advanced training
“OTI workshop·2011ETAP Programe advanced
“OTI workshop”.·2011Automatic (Conventional) Control with Contactors certificated
“ Silesian institute Donbosco”·2009Auto Cad (2D).
Silesian institute Donbosco”.·2009Automatic (Conventional) Control with Contactors certificated
“ Silesian institute Donbosco”·2009AutoCAD (2D) certificated
”Silesian institute Donbosco”.·2009Summer Training
The Egyptian German Electrical Manufacturing Company (EGEMAG·2008Summer Training
ABB Company·2008Summer Training
ABB Company·2008International Computer Driving License (ICDL)
“UNISCO”·2008International Computer Driving License (ICDL)
“UNISCO”·2008Programmable Logic Controller (PLC)
Jelecom A.D Panasonic"·2008Programmable Logic Controller (PLC)
" Jelecom A.D Panasonic"·2007Summer Training
The Egyptian German Electrical Manufacturing Company (EGEMAG) ·2007Summer Training
Cairo South Power Station·2006