
SRIKANTH SRIRAMOJU
Senior Structural Engineer
Dubai, United Arab EmiratesWork Experience
Civil Structural EgineerFull Time
ENI Iraq BV
Jul 2014 - Mar 2016 -1 yr, 8 months
United Arab Emirates , Dubai
- Job Details:ENI IRAQ BV (DUBAI) DUBAI/BASRA IRAQ, UAE July 2014 – Present CIVIL STRUCTURAL ENGINEER Accountable for review of all the civil engineering documents submitted by the EPC contractor for the Degassing Station, Power Plant and High Voltage Transmission line Tower package which is part of the Oil n Gas project at Zubair oil field, Basrah, Iraq, with reference to FEED technical specification provided to contractor as part of contract tender document. Currently, positioned at site for the inspection of the construction activities. Key Achievements: Successfully reviewed all the engineering design calculations, drawings submitted by the EPC contractor. Addressed the numerous technical queries, deviation requests & reviewing the variation orders raised by the EPC contractor. Participated in various 3D modelling reviews, operability and maintainability reviews at various stages of the project. Delivered all kinds of technical advice, assistance and support to the work pack manager, contracts administrator, planning and project controls team.
Civil Structural Engineer Full Time
Bechtel India Pvt Ltd
Feb 2011 - May 2014 -3 yrs, 3 months
India , New Delhi
- Job Details:Projects Handled at Bechtel India Pvt. Ltd. Gurgaon as Civil Structural Engineer: Project: Muscat International Airport Project Period: Feb’11 to Aug’12 Role: Responsible Engineer/Team Lead. Key Achievements: Directed interim design calculations/drawings submission of North/West/South piers of PTB detail design submission of the north. Headed a team of 6 Engineers to meet the schedule for deliverables of the west pier. Project: Panda Power Project, Texas, USA Period: Sep’12 to Feb’13 Role: Responsible Engineer; Analysis Software: Staad Pro; Code: American Standards. Delivered assistance to the team for 6 months to meet the accelerated deliverable schedule at a critical stage. Delivered the submission of following 4 equipment foundation design calculations at a critical stage of the project. Boiler Feed Pump, Ring wall foundation design calculation for Demineralized water storage tank. Mat foundation design calculation for Steam Turbine Generator Electrical Equipment Module building frame. Circulating water fore bay supporting platform foundation design. Project: Quebrada Blanca Fase 2 Period: Mar’13 to Oct’13 Code: Chilean and American Standards . Metal and Mining Project at Chile, South America where Copper Concentrator Plant was proposed for construction. Carried out design calculations for various equipment foundations like storage tank and pump foundations. Prepared a design calculation for concrete circular water tank with various distribution chambers. Handled the lime storage bin supporting structure analysis and design of foundation. Project: Reliance Industries Ltd., 360 MW Coal Based Captive Cogeneration Power Plant at Hazira & Dahej, Gujarat, India. Period: Nov’13 to May ’14 Handled the submission of following 4 equipment foundation design calculations at a critical stage of the project: Blow down Sump Design. Pipe rack foundation design.
Post Graduate Engineering Trainee to Asst Engg ManagerFull Time
Larsen & Toubro ECC Division
Jun 2006 - Jan 2011 -4 yrs, 7 months
India , Chennai
- Job Details:Project: IT Park for L&T’s E-Engineering Solutions, Vadodara Key Achievements: Actively served as the part of team that worked on a 2 Basements + Ground + 6 Storey Office Building. Evaluated, designed & prepared detailing of post-tensioned flat slabs of all the floors. Project: OP Jindal Global Law University, Sonepat, Haryana Executed the analysis and designing of a structural steel truss-concrete composite building frame for the academic block building with a unique architectural concept and structural framing that consisted of only reinforced concrete walls as the main lateral force resisting elements without the columns and also falling in the severe seismic zone 4. Key Achievements: Headed a team of 3 Engineers. Project: ATC Tower & Passenger Terminal Building (PTB), Mumbai International Airport Limited Mumbai Functioned with the team that worked on check-in/retail area of the PTB. Examined the work approach/style of various MNCs in the industry viz., ARUP, SOM and CH2MHILL. Key Achievements: Controlled several deliverables of the building going through a process of client review/approval for all the calculations and drawings before issuing for construction. Project: Business & Exhibition Center - Mahatma Mandir, Gandhinagar, Gujarat Key Achievements: Conducted analysis & designing of structural framing for an auditorium with inclined columns and a grid beam system for very large spans of the roof viz. ~25m. Project: Hyderabad Metro Rail Transport System Key Achievements: Successfully maintained coordination with all the disciplines. Managed the issue of Bill of Quantities for all the external items to the costing team in the business unit. Project: Knowledge City Vadodara Phase – 2 Role: Engineering Coordinator Estimated and prepared drawings for schedule as per the construction team’s requirements. Key Achievements: Delegated the work to a team of 3 Engineers + 2 Designers for successful completion of the project. Functioned as Engineering Coordinator for the project with Basements+G+6 Storied Building with a Shear Wall-Beam Column Frame System. Project: Proposed Mixed use commercial project, Noida City Center – 1 Role: Engineering Coordinator Analysis Software: ETABS, SAP and the Mat Foundation Analysis and designed in SAFE Codes: Indian Standards Description: The proposed building to be constructed in New Delhi, India was mixed use commercial development which includes a hotel, serviced apartments and commercial retail space totaling approximately 2.1 million square feet of usable space in a single building with 40 stories. Prepared the bill of quantities and techno-economic indices as required by the business unit for bidding proposal. Key Achievements: Developed the design basis report. Conducted preliminary analysis/design and sizing of all elements of the building with pile foundations. Project: Signature Tower Kochi, 15 Stories Office Building Role: Team Lead Project: Implemented preliminary analysis for estimating the quantities. Submitted a structural bill of materials and techno-economic indices to business unit for tendering.
Education
Master of Technology in Structural Engineering in Structural Engineering
National Institute of Technology, CalicutJan 2004 - Jan 2006 - 2 yr
Bachelor of Engineer (BE) in Civil Engineering
Osmania UniversityJan 1999 - Jan 2003 - 4 yr
High School - Other
ST Johns Church High SchoolJan 1996
Skills
- Staad Pro
- MS Excel
- ETABS, SAP(Structural Analysis Programme) SAFE
- Buildings - Analysis Design & Detailing
- Post Tension-ed Flat Slab Design
- Mathcad
- Microsoft Excel
- Microsoft Word
- Microsoft Powerpoint
- Microsoft Outlook
View More
Languages
English
AdvancedTelugu
AdvancedHindi
Advanced