Ibrahim Fadl Ibrahim
Electrical Mantainance Sec. Head
Badrasheen, Giza, EgyptWork Experience
Electrical Mantainance Sec. HeadFull Time
icopack
Jan 2009 - Jun 2019 -10 yrs, 5 months
Egypt , Giza
- Job Details:• Analyzed the company procurement process based on historical data and questionnaire results which led to the identification of the weak points in the system. • Planning and supervising (Preventive - curative - Predictive ) Maintenance for the Plant. • Repair and Improve Performance of the Control and Power Circuits ,and Insurance Spare Parts. • Management of administrative department and ISO 9001,22000,ERP System. • Participated in Utility Department (Boilers- Air Compressors - Over Head Cranes- Chillers -Electrical Distribution Panel- Transformers – power Factor- H.v. Ring Main Unites). • Participated in Siemens plc , scada program ,AC,DC Drives. Siemens PLC S5 & PLC S7 using S7- 300. Siemens Sinamics ,Master Drive,Micro Master AC Drives & SIMOREGK DC Drive • Participated in Telemecanique Drives: Telemecanique AC Drives ( Altivar 66 &71 ) • Participated in Thickness gauge measurement system from SCANTECH (X-RAY). • Participated in High voltage surface treatment (Mero Co).
shift engineerFull Time
icopack
Jan 2007 - Jan 2009 -2 yrs
Egypt , Giza
- Job Details:• I do my best to achieved Safe Operation of the Main Line, Utilities. • Repair & Troubleshooting of the Main Line and the Utility including Slitters, Metalizer, Air Compressors, Boiler, Cooling Towers ,Fork Lifts, Electrical Panels Medium Voltage and Low Voltage ,Circuit Breakers,…. • Capable of Reading and Understanding Technical Drawings and Manuals.
Utility Maintenance EngineerFull Time
Icopack
Jun 2004 - Jan 2007 -2 yrs, 7 months
Egypt , Giza
- Job Details:• Participated in Utility Machines: Ring Main Unit 22 KV ( ABB SF6 Circuit Braker) Power Transformer 22KV/380 V MDB (ABB , Schneider, Siemens Main Electrical Distribution Panel.). Thermal Oil Boilers (Wiesloch 1000 kw – Babcock Wanson 1744kw) Chillers (Carrier- Epsi ….) Air Compressors (Ingersoll-Rand - Atlas Copco) Over Head Crane (Demag– Kito – Koli- Cone Crane )
Education
B.Sc in Electrical Power ,Machine and Control Department in B.Sc in Electrical Machine and Power Department
Cairo University (CU)Jan 1998 - Jan 2003 - 5 yr
Achievements
My Main Achievements:- - I have developed an Old Siemens Main Converter Drive by New Type Sprint Electric Converter 1200 A and modified the Electrical Circuit,Cables and PLC S5 Program.And Several other Converters in Sub Machines ranging from 35 to 350 which improved Performance and reduceing the Faults. - Development of a Thickness Measuring Device Model scantech France through Agent taking upon Myself the Responsibility to Address the Agent by Phone, E-Mails,Arranging Visits,and Technical Reports. - Repair Many Faults and provide Spare Parts for Old and finished Manufacturing Spare Parts ,doing Developments by Alternatives are available in the Local and International Market. - Change an Burner works with Solar by anather one works by Natural Gas and made the required Adjustments and change the Control Circuit, Which led to saving a lot of Money. - Participate in the installation and Commissioning and startup for New Bruckner Poly Propylen
Skills
Languages
Arabic
FluentEnglish
Advanced
Training & Certifications
light current
egycet·2014power system distribution
egycet·2014ac drive altivar 71
shnider electrical ·2012plc s7 -300 , wincc flexable
siemens·2011