Job Details
Experience Needed:
Career Level:
Education Level:
Salary:
Job Categories:
Skills And Tools:
Job Description
- Has the ability to produce high-end schedules for different types of projects including construction, rehabilitation, finishing
- Uses Primavera to generate either detailed or conceptual plans
- Can analyze different presented schedules, perform following ups and control them
- Presentations, conceptual designs, updated plans, following up
- Ensures the delivery of the project with the required time, quality and cost
- Can use AutoCad for the required
- have experience for costing control for projects
Job Requirements
- Has at least a 7-year experience in the field
- Achieves the required within the time
- Has the ability to lead the several projects at the same time
Featured Jobs
Similar Jobs
- Business Development Manager (...United Group For Engineering And Investment - Nasr City, Cairo3 days ago
- Project Control ManagerAlmasrya for Contracting, Management & Maintenance - Nasr City, Cairo16 days ago